EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 26, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a sidewalk / parking lot in Johnston, Iowa. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Construction of the SIDEWALK REPAIR PROGRAM 2024 ZONE 2 including all materials, labor and equipment necessary for the installation of approximately: 3,000 SY of sidewalk, 1,600 SY of PCC pavement, 400 SQ of sod, erosion control, surface restoration and miscellaneous related work and appurtenances. Each bidder shall accompany its bid with bid security as defined in Iowa Code Section 26.8, as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in a form acceptable to the City, for the faithful performance of the contract and guaranteeing payment to all persons supplying labor and/or materials in the execution of the work provided for in the contract, in an amount equal to 100% of the amount of the contract. Additionally, the bidder must provide the City with a guarantee of maintenance of said improvement for a period of four (4.0) years from the time of final acceptance by the City. The bidders security shall be in an amount equal to ten percent (10%) of the total amount of the bid and shall be in the form of a cashiers check or a certified check drawn on an FDIC insured bank in Iowa or on an FDIC insured bank chartered under the laws of the United States; or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States; or a bid bond on the form provided in the contract documents with corporate surety satisfactory to the City. The bid shall contain no condition except as provided in the specifications. Work on said project shall commence within ten (10) days of the issuance of a written notice to proceed. The notice to proceed is expected to be issued April 4, 2025. The project shall be completed as follows: Substantial Completion Date = October 3, 2025 Final Project Completion Date = May 29, 2026 Liquidated damages in the amount of Five Hundred Dollars ($500.00) per day will be assessed for each day that the work remains uncompleted after the end of each contract period. Questions concerning interpretation or intent of the Contract Documents should be directed to: Justin Ernst, PE Bolton & Menk, Inc 430 E Grand Ave Ste 101 Des Moines, Iowa 50309 515.318.8082

Award

Sidewalks / Parking Lot

$523,076.00

Public - City

Paving, Site Work

141

6

98

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
30
Bidding Soon
617
All Active Projects
369
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2025

April 4, 2025

img_map_placeholder

Multiple Locations, Johnston, IA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Sidewalk Repair Program 2024 - Zone 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.