Published March 3, 2025 at 7:00 PM

Updated March 4, 2025

Site work and paving for a bridge / tunnel in Los Altos Hills, California. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Reference Number 0000377177 Purchase Type Term: 05/14/2025 03:00 AM EDT - 01/31/2028 03:00 AM EST Question Deadline 03/25/2025 at 4:00 PM PT Questions are submitted online Yes Description The Midpeninsula Regional Open Space District is pleased to announce the opportunity to provide professional design and engineering services for the Purisima Creek Trail Slide and Bridge Repair (Project) at Purisima Creek Redwoods Open Space Preserve ("Project"). Federal Emergency Management Agency (FEMA) financial assistance will be used to fund all or a portion of the Project. In the winter storms of 2023/24, six (6) sites along the outside edge of the Purisima Creek Trail (dirt road) washed out / failed impeding safe vehicle passage for District (or other) emergency access and maintenance vehicles. In addition, the abutments on two (2) repurposed rail car bridges were also undercut by stream bank erosion impeding safe passage. A detailed assessments and evaluation of the extent of road and bridge damage was completed in January 2024 by Timothy C. Best, CEG, and a report was developed that provides preliminary and conceptual recommendations, and present high level cost estimates to reopen the road and bridge crossings at an 8' width for Utility Terrain Vehicle (UTV) access. This RFPQ seeks to procure the most-qualified team to further develop and build upon the initial assessments and proposed repairs into a schematic design, progress it through design development, document the design for permitting and construction, support the bid process and engage in construction administration. Project Design Objectives and Requirements Purisima Bridges 1 & 2 Bridge PC 1 - The project proposes to remove the existing log abutments and reset the current 52' long by 8' wide rail car bridge on new concrete abutments, including armoring both channel banks with rock rip rap, allowing for continued UTV and recreational trail access. Bridge PC-2 - The project proposes to remove the existing 41' long by 8' wide rail car bridge and replace it with a new 60' long by 8' wide bridge for continued UTV and recreational trail access. The existing bridge is too short and channel banks too unstable to be reused. Purisima Creek Trail Slides 1-6 The project proposes to 1) remove slope failure material, 2) grade into the inboard hillside to reestablish a UTV-width trail bed, and 3) install rock slope protection on the downslope edge of the trail failure areas to armor and anchor the trail slope. The project also proposes to remove trees as needed and utilize for slide anchoring, to grade and rock new trail alignment, and to install erosion control BMP's and seeding within slide material areas above and below the new trail alignment. The project is anticipated to be constructed over two separate construction seasons and bid as two separate projects (Phase I and Phase II). Therefore, Tasks 1 and 2 of the Scope of Work will be performed once and used to inform the remainder of work on the Project. Tasks 3-5 will be performed twice, once for each of Phase I and Phase II. The Phase I scope of work consists of completing all necessary repairs to Bridge 1 and 2, and Slide 5. The Phase II scope of work consists of completing all necessary repairs to Slides 1-4 and Slide 6. RFQP and Award of Contract Schedule The following is a tentative schedule that is subject to change. 2/19/25: RFQP Release 3/5/25: Pre-Proposal Site Tour 3/12/25: Pre-Proposal Site Tour 3/25/25: Deadline to receive questions 4/1/25: Final Addendum Issued 4/10/25: Deadline to receive proposals (4:00 PM) 4/15/25: Firm presentations / interviews (if deemed necessary) 4/16/25: Ditrict issues final rankings 4/17/25: Begin negotiations with top-ranked firm(s) 5/14/25: Board of Directors approves contract General Requirements - Insurance Required Award Requirements - All or None Award The method of Contractor Selection has not been Determined at this time.

Conceptual

Bridges / Tunnels

$300,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2026

Project location map

5050 El Camino Real, Los Altos Hills, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.