Published March 28, 2025 at 8:00 PM
Updated April 2, 2025
Site work for a civil project in Bayfield, Wisconsin. Completed plans call for site work for a water / sewer project.
Site Directions: Red Cliff WWTF is located approximately 1/2 mile north of Legendary Waters Resort & Casino in Red Cliff, WI, along Blueberry Road. Site Address: 88385 Pike Road City: Bayfield County: Bayfield State/Province: WI 1. Clear and grub the berm areas for three existing lagoon cells including stump removal and hauling debris off site for disposal. Complete grading, fertilizing, seeding, mulching and plant preparation mats for disturbed areas on the berm tops and outside slopes. 2. Remove municipal wastewater sludge from the bottom of lagoon Cells #2, #3 and #4. Dewater the sludge on site and transport and dispose of the dewatered sludge in a landfill. 3. After sludge removal, re-grade the bottom of 2 existing lagoon cells, install drain tile and install a complete membrane liner system including geotextile, air vents and HDPE liner. Install water transfer piping and valves, HDPE liner pipe penetrations and concrete splash pads. Abandon existing water transfer pipes and associated valves. 4. Install approximately 541-ft of 8" PVC gravity sewer main and two (2) manholes to convey diverted sewage from the WWTF influent to the lagoon cells. Modification to one (1) existing manhole is required. 5. Construct a new pre-packaged lift station near the lagoon cells including approximately 47-ft of 10" HDPE intake piping and screen, electrical power wiring, conduit and an electrical control system. 6. Install approximately 510-ft of 3" HDPE sewage force main to convey sewage from the lagoon cells to the WWTF influent. Connect the new force to an existing manhole. 7. After the completion of lagoon lining and lift station construction, abandon one existing lagoon cell by demolishing portions of the berms and grading the area for drainage. 8. Construct approximately 1038-ft of 12-ft wide gravel access road. 9. Modify existing site fencing and gates including removal, salvage and re-installation of existing chain link fencing and provide new field fencing and gates. Est. Completion Date: Oct. 31, 2026 Question Deadline 03/19/2025
Post-Bid
Water / Sewer
$400,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 26, 2025
April 25, 2025
88385 Pike Rd, Bayfield, WI
Related To This Project
Bayfield, WI
Bid Date: Mar 10 2025
Bayfield, WI
Bid Date: Apr 15 2025
Bayfield, WI
Bid Date: May 12 2025
Bayfield, WI
Bid Date: Feb 23 2026
Bayfield, WI
Bid Date: Jun 05 2025
Bayfield, WI
Bid Date: Jun 20 2025
Bayfield, WI
Bid Date: Jun 12 2025
Bayfield, WI
Bid Date: Dec 20 2024
Bayfield, WI
Bid Date: Jan 14 2025
Bayfield, WI
Bid Date: Dec 02 2024
Bayfield, WI
Bid Date: Dec 02 2024
Bayfield, WI
Bid Date: Nov 14 2024
Bayfield, WI
Bid Date: Nov 14 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.