Published May 12, 2025 at 8:00 PM

Updated May 13, 2025

Site work and paving for a mixed-use development in Westchester, Illinois. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

**As of May 12, 2025, the project was awarded to J. Congdon Sewer Service, with an awarded amount of $6,957,032.11.** 2025 Water Main Improvements Program Site Address: Various locations within the Village Site Directions: Canterbury Street, Pelham Street/Drury Lane, and Norfolk Avenue within the Village of Westchester, Cook County, IL 60154. Est. Value Notes: $5,000,000 Est. Completion Date: Nov. 21, 2025 The proposed work is officially known as "2025 WATER MAIN IMPROVEMENTS PROGRAM" and further described as new 8" PVC water main installation, construction of lateral WMQ storm sewers, abandoning the existing water main, water service box removal and replacement, valve vaults, fire hydrants, lead service replacement into the home, storm and sanitary sewer spot repairs, various roadway resurfacing treatments, and all necessary restoration as further described in the contract documents for the said work prepared by Christopher B. Burke Engineering, Ltd. (CBBEL). All water main improvements shall be constructed with the use of Local Funds, with portions of the Norfolk Avenue water main improvements being construction with CDBG Funds. Special attention shall be called to the Cook County CDBG Grant ($200,000) the Village has received for water main improvements on Norfolk Avenue from Roosevelt to Gladstone (Grant #2407-027). The Contractor shall provide 24% MBE and 10% WBE towards this work. All $200,000 of Cook County CDBG Funds for the "Norfolk Avenue Water Main Improvements" portion shall be expended by September 30, 2025. No work can begin until May 1, 2025 unless otherwise authorized by the Village in writing. All questions shall be submitted via email to John LaPaglia at jlapaglia@cbbel.com.

Award

Water / Sewer

$6,957,032.00

Public - City

Paving, Site Work

156

10

11

4

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Contaminated Site Material Removal, Underground Storage Tank Removal, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 12 - Furnishings

Division 12 - Furnishings

Art
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Turf and Grasses, Plugging, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
117
Bidding Soon
1,971
All Active Projects
776
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2025

May 19, 2025

img_map_placeholder

Multiple Locations, Westchester, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.