BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 7, 2025 at 7:00 PM

Updated March 8, 2025

Site work and paving for a mixed-use development in Kenmore, Washington. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project builds approximately 742 LF of new sidewalks on west side of 84th Ave NE and 715 LF of new sidewalk on the east side of 84th Ave NE from NE 150th St - NE 155th St. Project will also include buffered bike lanes on both sides of the street, curb bulbs to reduce the crossing distances on side streets, and a new rectangular rapid flashing beacon (RRFB) at NE 151st Place. As of March 7, 2025, this project is included in the city's 2025-2030 Capital Improvement Program (CIP). A design firm has not yet been selected. Construction should begin in mid 2028. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Sidewalks / Parking Lot

$3,432,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
1
Bidding Soon
950
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2028

Project location map

84th Ave NE, Kenmore, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.