Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 13, 2025 at 8:00 PM
Updated April 17, 2025
Site work and renovation of a mixed-use development in Crown Point, Indiana. Completed plans call for the renovation of a power facility; for site work for a power facility; power facility; and power facility.
Project includes the installation per design of solar photovoltaic (PV) panels, racking, inverters, fencing, and electrical connective equipment on the ground of the Lake County Government Center Utilities. Install AC panel boxes for collecting the AC power from the inverters and distribute to the electrical service. Install connective equipment from the AC panels to the utility grid per utility s direction. Work includes all materials required to ground mount 1968 - 590Wdc solar panels, connect to 16 inverters, connect to AC collector/distribution panel, and interconnect to the service side of the new, utility transformer at 277/480V (3-phase, Delta-grounded WYE). Each bidder shall accompany his proposal with the proper bid security made payable to the Board of Commissioners of Lake County as follows: Any person, firm or corporation who submits a proposal and has a principal place of business in the State of Indiana MUST submit a BOND in the amount of five percent (5%) of their total bid. Any person, firm or corporation who submits a bid and DOES NOT have a principal place of business in the State of Indiana MUST file with their bid a CERTIFIED CHECK BANK DRAFT, CASHIER S CHECK or MONEY ORDER issued by a financial institution by an agency of the United States in the amount of five percent (5.0%) of their bid, made payable to the Board of Commissioners of Lake County. The successful Bidder will be required to carry Workmen s Compensation, Employee s Liability Insurance and Comprehensive Public Liability and Property Damage Insurance in amounts and with companies satisfactory to the owner. In addition, the contractor shall furnish Performance and Payment Bonds for 100% of the Contract Sum. Executive Summary of Goals. 1) Employment - The contractor shall have a goal of Thirty-Four (34%) Percent of minority work force participation (as a percentage ofthe total number of employees or the total number of hours worked on the project, whichever is greater) and 6.9% for work force participation by women (as a percentage of the total number of employees or the total number of hours worked on the project, whichever is greater), if available. Subcontractors and Suppliers- A goal ofThirteen (13%) Percent forMBE participation and Two (2%) Percent for WBE participation (as a percentage of the total contract amount) is hereby set for the project. The Owner reserves the right to accept or reject any Bid and to waive any irregularities in the bidding. All bids may be held for a period not to exceed 120 days, or as otherwise stated in the Contract Documents before awarding the contract.
Post-Bid
Solar Power Generation
$300,000.00
Public - County
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 16, 2025
May 16, 2025
2293 N Main St, Crown Point, IN
Related To This Project
Crown Point, IN
Bid Date: Apr 17 2025
Crown Point, IN
Bid Date: Apr 03 2025
Crown Point, IN
Bid Date: May 07 2025
Crown Point, IN
Bid Date: May 21 2025
Crown Point, IN
Bid Date: Jun 18 2025
Crown Point, IN
Bid Date: May 21 2025
Crown Point, IN
Bid Date: Jun 02 2025
Crown Point, IN
Bid Date: Jun 18 2025
Crown Point, IN
Bid Date: Mar 13 2025
Crown Point, IN
Bid Date: Mar 21 2025
Crown Point, IN
Bid Date: Mar 31 2025
Crown Point, IN
Bid Date: Apr 14 2025
Crown Point, IN
--
Crown Point, IN
Bid Date: Feb 12 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
