EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 25, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Jacksonville, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

THIS PROJECT HAS A $75.00 nonrefundable REGISTRATION FEE: ALL BIDDER MUST REGISTER @ DLZ Logan Street Improvements - 2025 PROJECT SCOPE: The project work shall consist of Street Improvements and related appurtenances and equipment, including all labor, materials and equipment necessary to complete the construction in accordance with the Contract Documents. PROJECT COST ESTIMATE: $208,300.00 Bid Guaranties must be substantially in the bid guaranty form provided herein. If a bond is given, it shall be in favor of the Owner, and for the full amount of the bid. If the bid guaranty is given by a surety company, proof of authority of the officer or agent signing the guaranty, together with a recent financial statement of the surety company, shall be attached. In case a letter of credit, or certified or cashier's check is given, it shall be drawn on a solvent bank authorized to do business in Ohio, payable to the order of the "(Owner)". The amount of the check shall be ten percent (10%) of the amount of the bid price submitted or, in the case several bid prices are submitted, of the greatest total that can be derived by combining the various bid prices. The amount of such check of the bidder to whom the award is made shall be paid to the Owner as stipulated for liquidated damages if the said bidder fails to enter into a contract with the Owner and to furnish the required contract bond within ten (10) days after notice of acceptance of its proposal. Award will be made within sixty (60) days of opening of bids. The bid guaranties, letters of credit or checks of all but the lowest three (3) bidders, will be returned by mail within sixty (60) days after opening of bids; bid guaranties, letters of credit or checks of the lowest three (3) bidders will be canceled or returned within ten (10) days after the execution of the contract. Each bid shall be accompanied by a Bid Guaranty and Contract Bond as required by Section 153.54 of the Ohio Revised Code in an amount equal to the sum of the bid submitted by each contractor. In lieu of posting the bond, a bidder may use a Cashier's Check, Certified Check or Letter of Credit for ten percent of the Contractor's bid as bid security. When a check or letter of credit is used, the bidder shall be required to post a 100 percent Performance Bond and a 100 percent Labor and Material Payment Bond, upon the signing of the contract. Project Completion Substantial Completion date for the contract shall be 60 days from date of Notice to Proceed. Final Completion date for the contract shall be 90 days from date of Notice to Proceed. The VILLAGE OF JACKSONVILLE reserves the right to reject any and all bids, and the right to accept the lowest and best bid, the right to waiver minor irregularities on any bid, and the right to accept the bid proposal which promotes the best interest of the VILLAGE OF JACKSONVILLE. Rejection of Bid Proposals The Owner reserves the unqualified right to reject any or all proposals received. Blank spaces in the Proposal must be properly filled in and the phraseology of the Proposal must not be changed. Additions, qualifications or limitations must not be made to the items mentioned therein and any unauthorized conditions, limitations or provisions attached to a Proposal will be liable to render it informal and may cause its rejection. The right is reserved to waive informalities, irregularities, and technical defects of a non-material nature, as the interest of the Owner may require. Question Deadline 03/20/2025 Send requests to: DLZ Ohio Inc., 30661 Red Rock Court, Logan, Ohio 43138; by Email: mbetts@dlz.com or by fax (740) 380-3535; Attention: Michael D. Betts, P.E. Prospective bidders shall submit written requests ofsaid questions to the Engineer, at least five (5) working days before the bid opening date.

Award

Roads / Highways

$178,975.00

Public - City

Paving, Site Work

9

8

2

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Glass Unit Masonry, Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Backfill, Compaction, Embankments, Shoring and Underpinning
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
42
Bidding Soon
846
All Active Projects
353
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2025

May 19, 2025

img_map_placeholder

Multiple Locations, Jacksonville, OH

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Street Improvements - 2025

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.