Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 28, 2025 at 8:00 PM
Updated March 29, 2025
Site work and new construction of a municipal facility in Covington, Georgia. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.
The City of Covington, GA is requesting proposals, (RFP) from professional Development/ Design/ Build firms that are interested in, and capable of providing, a combination of professional services, to provide Architectural/Engineering design services, pre-construction consulting services and construction services for a new Utilities Center facility. The services would include providing the site location (minimum of 15-25 acres within the city limits) and required site work of the property, the confirmation of compatibility of the space needs program, cost budget through design, construction, contract closeout and warranty enforcement, preparation of all design and construction documents and construction compliance inspection services, pre-construction consulting services to control project cost and schedule during the design, and construction services. Scott Cromer scromer@cityofcovington.org 770-385-6832 The project has a stated cost limitation of $22,000,000.00 inclusive of the property (site location) all fees, demolition, design and construction costs and loose equipment and with contingency included. Question(s) deadline March 6th, 2025 by 3:00PM Evaluations Process March 24th - March 28th, 2025 Award Anticipated - April 7th, 2025 Any inquiries, regarding this RFP must be submited in writing no later than 3:00 PM local time on March 6, 2025 to: Scot Cromer, email: scromer@cityofcovington.org. Questions will be answered in writing by addendum and posted on the City's website. Questions received atier this time will not receive a response. The city reserves the right to accept or reject any or all proposals received, cancel all or part of this RFP, and waive any nonmaterial irregularities or informalities and to request additional information from proposing institutions. The City shall accept all proposals that are submited properly. However, the City reserves the right to request clarifications or corrections to proposals.
Post-Bid
Municipal
$22,000,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 20, 2025
July 21, 2025
To Be Determined, Covington, GA
Related To This Project
Covington, GA
Bid Date: Apr 03 2025
Covington, GA
Bid Date: Apr 03 2025
Covington, GA
Bid Date: Apr 03 2025
Covington, GA
--
Covington, GA
Bid Date: Jan 05 2026
Covington, GA
Bid Date: Apr 03 2025
Covington, GA
Bid Date: Aug 20 2021
Covington, GA
--
Covington, GA
Bid Date: Apr 04 2025
Covington, GA
Bid Date: Mar 03 2025
Covington, GA
Bid Date: Mar 20 2025
Covington, GA
Bid Date: Mar 25 2025
Covington, GA
Bid Date: Apr 08 2025
Covington, GA
Bid Date: Feb 27 2025
Covington, GA
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
