Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 11, 2025 at 8:00 PM
Updated April 12, 2025
Site work and asbestos abatement for a municipal facility in Storrs Mansfield, Connecticut. Completed plans call for site work for a municipal facility; and for asbestos abatement for a municipal facility.
Question Deadline 03/13/2025 at 2:00 PM ET All Requests for Information questions are to be posted under the Q&A Board Tab in the online portal. No phone calls or RFI questions emailed directly to the Procurement Agent will be accepted. Project entails asbestos flooring and texture ceiling coating removal. Drop light fixtures on each floor and remove all ACM ceiling texture coating and associated primer from all dorm room ceilings to bare metal decking in South Tower Floors 1-3 and North Tower Floors 2-6. (Sixth floor only has texture coat behind the light fixtures.) Remove ACM floor tile/mastic from all dorm rooms in South Tower Floors 1-3 and North Tower 2-6. COST PROPOSAL: Submit a Cost Proposal utilizing the Form provided. No substitution of the Form is permitted. Bid Security: Provide a copy of a Bid Bond made out in the penal sum of ten percent (10%) of the Total Bid Amount. In lieu of a Bid Bond, a Certified Check in the amount of ten percent (10%) of the Total Bid Amount is acceptable. A Bid Bond is only required for any Total Bid Amount over $50,000.00. A Total Bid Amount of $50,000.00 or less does not require a Bid Bond. 5. Bonding Capacity: Provide a letter from your bonding company or representative confirming bonding capacity and include if they have ever had to complete or finance work on your behalf. Bonding capacity shall be for, at a minimum, the Total Bid Amount submitted for this Project. CONTRACT: A draft of the contract has been provided with the solicitation documents. The University reserves the right to modify the contract or waive any informality as it deems to be in the best interest of the University. By submitting a Bid, your Company accepts the contract and any modifications that the University deems necessary to it without exception. Bidders will be notified of any modifications to the contract made by the University. Any exceptions to the contract submitted by the Bidder will not be considered. SELF-PERFORMANCE REQUIREMENT: If awarded this contract, the Contractor shall be required to perform not less than ten percent (10%) of the Total Contract Price with its own forces.
Bid Results
Municipal
$579,000.00
Public - State/Provincial
Asbestos Abatement, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 8, 2025
May 30, 2025
1276 Storrs Rd, Storrs Mansfield, CT
Related To This Project
Storrs Mansfield, CT
Bid Date: Feb 19 2026
Storrs Mansfield, CT
Bid Date: Apr 03 2025
Storrs Mansfield, CT
Bid Date: Apr 15 2025
Storrs Mansfield, CT
Bid Date: Mar 03 2026
Storrs Mansfield, CT
Bid Date: Jun 18 2025
Storrs Mansfield, CT
--
Storrs Mansfield, CT
Bid Date: Dec 11 2025
Storrs Mansfield, CT
Bid Date: Apr 29 2025
Storrs Mansfield, CT
Bid Date: Mar 25 2025
Storrs Mansfield, CT
Bid Date: Apr 24 2025
Storrs Mansfield, CT
Bid Date: Mar 13 2025
Storrs Mansfield, CT
Bid Date: Apr 22 2025
Storrs Mansfield, CT
Bid Date: Feb 26 2025
Storrs Mansfield, CT
Bid Date: Apr 23 2025
Storrs Mansfield, CT
Bid Date: Jan 28 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
