Site work for a road / highway in Northampton Township, Pennsylvania. Completed plans call for site work for a road / highway.

Traffic Signal and Intersection Improvements at the Newtown-Richboro Road (SR 0332) and St. Leonards Road intersection within Northampton Township, Bucks County, PA. Questions must be submitted via online by March 28, 2025, at 5:00 PM. Submission of a question does not guarantee that such question will be answered. All proposals (bids) are to be accompanied by a bid bond or certified check in the amount of 10% of the total bid. The Township reserves the right to waive any minor informalities, irregularities or defects in the bid; or to reject any or all of the bids. The successful Bidder must comply with Pennsylvania Prevailing Wage Act. All Bidders are required to establish proof of competency and responsibility, in accordance with 67 PA Code Chapter 457, Regulations Governing Prequalification of Prospective Bidders and PennDOT Form 408/2020, as supplemented and amended, Section 102. Subcontractors must prequalify in the same manner, if listed in the proposal or if they subsequently undertake the partial or total construction of one or more items of work. All Prime Contractors must be PennDOT Pre-qualified Prime Contractors. All Subcontractors must be PennDOT prequalified. No bid may be withdrawn within sixty (60) days after the opening thereof, during which time the Township may review the bids and investigate bidder qualifications.

Bid Results

Roads / Highways

$606,934.00

Public - City

Site Work

21

9

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Heavy Timber
Division 08 - Openings

Division 08 - Openings

Hardware
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Fill, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
504
Active Projects
278
Bidding Soon
4,602
All Active Projects
2,120
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2025

May 12, 2025

img_map_placeholder

Richboro Rd & St Leonards Rd, Northampton Township, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Traffic Signal and Intersection Improvements Newtown-Richboro Road (SR 0332) and St. Leonards Road

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.