BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 2, 2025 at 8:00 PM

Updated April 3, 2025

Site work for a mixed-use development in Roseburg, Oregon. Completed plans call for site work for a playground / park / athletic field.

**As of April 2, 2025, project was awarded to LTM,Incorporated dba Knife River Materials but awarded amount is not available. Track Field Facility Improvement Project Info Contact: Joy Yori As described in full detail in Exhibit A - Construction Drawings, UCC's Track and Field Facility Improvements Project consists of site preparation and excavation followed by construction of a mechanically stabilized earth wall, new track surface, installation of select athletic event equipment, ADA compliant spectator seating area, fencing, utilities improvements, installation of controlled access points, and parking lot improvements for an NCAA Class 3 compliant track event facility. The project will be comprised of new materials and does include connections to existing underground utilities and the adjacent Field House Building (s). The work will be performed at the designated site on the Umpqua Community College Campus located at 1140 Umpqua College Rd, Roseburg, OR 97470. Work performed under the contract will require coordination with other trades and the track surface manufacturer/installer. Exhibits A - Construction Documents and Exhibit B - Special Provisions and Equipment Specifications are attached hereto and incorporated by this reference. The work to be done under this Contract consists of the following, but not limited to: 1. Demolish and remove the existing track surface. 2. Construct mechanically stabilized earth (MSE) wall. 3. Excavate and remove native material for spectator seating area. 4. Prepare subgrade for track surface. 5. Place Asphaltic Concrete Pavement (ACP) in preparation for track surface. 6. Construct permanent fencing to enclose facility to include collapsible bollards. 7. Place conduit for future electrical additions to include scoreboard and lighting. 8. Construction concrete footings (bases) for future for light poles. 9. Construct a steel gate at entry road access point from parking lot. 10. Obtain and install track and field event equipment per specification. 11. Obtain and assemble / install bleachers. 12. Perform additional and Incidental Work as called for by the Specifications and Plans. Deadline for Questions - 2:00 P.M. March 11, 2025

Award

Playgrounds / Parks / Athletic Fields

$700,000.00

Public - State/Provincial

Site Work

28

17

10

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
9
Bidding Soon
207
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2025

May 19, 2025

Project location map

1140 Umpqua College Rd, Roseburg, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.