BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 4, 2025 at 8:00 PM

Updated April 12, 2025

Renovation of a water / sewer project in Charlotte Amalie, Virgin Islands. Completed plans call for the renovation of a water / sewer project.

The Authority or VIPA invites the submission of electronic proposals for the furnishing of all labor, material, services and equipment for the removal and replacement of four (4) ticket counters at the Edward Blyden Marine Terminal on St. Thomas, Virgin Islands. The ticket counters must meet ADA compliant standards and should be able to withstand seablast. Question Deadline 03/28/2025 at 11:59 PM AT Online - Q&A The Virgin Islands Port Authority (VIPA) is seeking proposals from qualified individuals or firms to undertake the renovation of the four (4) ticket counters situated at the Edward Wilmoth Blyden, IV Marine Terminal. This initiative aims to enhance the overall functionality and aesthetic appeal of the ticketing area while ensuring compliance with the Americans with Disabilities Act (ADA). The selected contractor will be responsible for both the design and construction phases of the project, which includes providing a design that meets modern standards and regulatory requirements. The renovation process will involve not only the physical upgrades to the counters but also considerations for optimizing the workflow and improving the overall passenger experience. VIPA encourages innovative solutions that align with its vision for a seamless travel experience, while simultaneously addressing the need for ADA compliance to better serve all members of the community. Proposals will be evaluated based on a comprehensive set of criteria, including relevant experience, design creativity, cost-effectiveness, and adherence to project timelines. VIPA looks forward to collaborating with knowledgeable and experienced professionals who are dedicated to delivering highquality results. This project represents an important step towards enhancing operational efficiency at the marine terminal, ultimately contributing to the continued growth and development of the Virgin Islands as a premier destination for travelers. The contractor shall assume full responsibility for maintaining a clean and orderly worksite throughout the duration of the project, ensuring that debris is promptly cleared and that the area remains tidy while facilities are operational. It is imperative that the work is executed with minimal disruption to public. Furthermore, the contractor will be accountable for obtaining all necessary permits, including covering any associated costs, and must coordinate all required inspections to guarantee compliance with regulatory standards. Deliverables During all phases of removal and construction, all services to the facility must be maintained. The Contractor shall provide a conceptual design and preliminary cost estimated for VIPA's review. The Contractor shall provide final plans and specifications and cost estimates. The Contractor will be responsible for obtaining all necessary permits for this project. The Contractor shall provide construction service to construct project according to plans.

Post-Bid

Water / Sewer

$100,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
20
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2025

May 12, 2025

Project location map

Gasværks Gade, Charlotte Amalie, VI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.