BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 7, 2025 at 8:00 PM

Updated May 8, 2025

Renovation of a fire / police facility in Cottleville, Missouri. Completed plans call for the renovation of a fire / police facility.

**As of May 07, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Any questions or clarifications concerning this Request for Bid must be submitted in writing via E-mail (preferred), mail or fax to: Donna Clayton Finance Department, St. Charles County Government 201 North Second St St. Charles, Missouri 63301 Fax: (636)949-3870 dclayton@sccmo.org For questions or inquiries concerning the specifications please contact: Brian Cox Facilities Management Department, St Charles County Government 300 North Second St, Room 101 St. Charles, Missouri 63301 bcox@sccmo.org St. Charles County Government Facilities Management Department is seeking a bid replace the roof at the Police Department due to hail. General Notes: _ All work and services are to be performed by fully insured, qualified and trained journeyman workers with extensive experience of roof assembly and accessory replacements of this type, size and magnitude. _ All work and the workplace (site) shall be kept neat and clean throughout the execution of this project. All work shall be performed continuously by fully staffed crews until completion. _ Proper and continuous communications with the owner's representatives is paramount and required. _ Contractor to verify field dimensions and suitability. _ All specialty work, masonry, electrical, mechanical, lightening protection and plumbing to be performed by a licensed technician as part of the contract. _ Dispose of materials legally per OSHA, EPA and NESHAP regulations. (Provide waste manifest when asbestos is involved). _ Examine substrate and verify conditions are satisfactory to receive the new roof system. _ Advise Owner's representative of any areas unsuitable prior to commencement of installation. _ Install new treated wood as necessary. _ Fastener pullout testing as necessary to comply with manufacturer's published requirements. Perform and record pull tests according to ANSI/SPRI FX-1. _ Night seals shall be installed daily and removed prior to the commencement of work. _ Contractor shall protect the building and roofing components during all phases of construction. At no time shall the building be left in an un-watertight condition overnight. _ Nails penetrating treated wood shall be hot-dipped galvanized annular nails conforming to ASTM A-153. _ Screws installed in treated wood shall be stainless steel self-tapping screws, compatible with the metal being fastened. _ National Roofing Contractor Association sheet metal details are the basis of design. _ Owner to authorize hours for construction activity. Question deadline - 27 March 2025

Bid Results

Fire / Police

$858,252.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
90
Bidding Soon
1,296
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2025

May 2, 2025

Project location map

101 Sheriff Dierker Ct, Cottleville, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.