Published May 8, 2025 at 8:00 PM

Updated May 9, 2025

Site work for a civil project in Cottleville, Missouri. Completed plans call for site work for a water / sewer project.

There is a mandatory bidder's questionnaire (enclosed with the spec book) that is due with the bid. If the questionnaire is not received by this date and time, the general contractor will not be able to submit a bid on this project. The proposed work includes the furnishing of materials, tools, equipment and Labor necessary to construct the O'Fallon Wastewater Treatment Plant Grit Removal Improvements Project in O'Fallon, Missouri, with Bid Number: 25-035. Work includes the construction of: Demolition of the existing grit removal system equipment, including air lift pump, blower with piping, and grit classifier with piping. New grit removal equipment consisting of a new stacked tray grit removal tank insert with inlet channel connection inside existing grit tank with submersible grit transfer pump, grit classifier, and grit dewatering/conveyor unit. Additional upgrades include new piping from grit tank to grit classifying equipment, and drains back to grit tank. All civil, structural, electrical, mechanical, testing, process and instrumentation, and programming work required herein. Question Deadline - 04/26/2025 at 3:00 PM C - All requests for clarifications on these bidding documents must be received. The enclosed Request for Information (RFI) form shall be used for all submittals. Questions may be directed to the Engineer as follows: James MacAdam, P.E. Burns & McDonnell 425 S Woods Mill Rd #300, Chesterfield, MO 63017 314-682-1500 jmmacadam@burnsmcd.com. Bid Alternative with the installation of fiberglass-reinforced plastic (FRP) covers over the existing grit tank and proposed equipment. Bids must be submitted on the appropriate bid forms provided and must be accompanied by a Bid Security in the amount equal to and not less than five percent (5%) of the base bid, payable without recourse to the City. The Security may be in the form of a certified cashier's check or a bidder's bond in the same amount from an Incorporated Surety licensed to do business in the State of Missouri as a guarantee that the bidder will enter into a contract and execute a one hundred percent (100%) performance bond, a one hundred percent (100%) payment bond, and guaranty forms provided within ten (10) days after notice of acceptance of bid to him. Bid checks will be returned to the unsuccessful bidders when their bids are rejected. No bidder may withdraw his bid within 90 days after the bid opening. The City of O'Fallon, Missouri retains the right to reject any or all bids submitted. There is a mandatory bidder's questionnaire (enclosed with the spec book) that is due with the bid. If the questionnaire is not received by this date and time, the general contractor will not be able to submit a bid on this project. This is an estimate only and may or may not reflect the complete cost of any or all alternates in the proposal. The contractor is still required to submit a bid guaranty per the requirements in this proposal. Doc note: Corporate, certified, or cashier's checks shall be made payable to Drexel Technologies. Contract Documents will be shipped only if the requesting party assumes responsibility for all related shipping charges. Please note: Download file release is not automated. Orders for downloads may take up to an hour to be processed. The Contract Documents, including specifications, are on file at the office of Drexel Technologies at online and are open for public inspection. Copies of documents may be obtained from Drexel Technologies for the fee listed online. he Contract Documents, including specifications, are on file at the office of Drexel Technologies at online and are open for public inspection. Copies of documents may be obtained from Drexel Technologies for the fee listed online. The CITY reserves the right to reject any and all Bids, to waive informalities therein to determine the lowest and best bid, and to approve the bond. No Bid may be withdrawn for a period of ninety (90) days subsequent to the specified time for receipt of Bids.

Bid Results

Water / Sewer

$1,439,673.00

Public - City

Site Work

66

27

15

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
1
Bidding Soon
979
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2025

May 30, 2025

Project location map

150 Firma Rd, Cottleville, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.