BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 27, 2025 at 8:00 PM

Updated May 28, 2025

Site work and paving for a mixed-use development in San Diego, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

1. Furnish all labor, materials, equipment, supplies, transportation, and disposal as necessary to complete the construction of Sand Replenishment at Kellogg Beach FY 2025 as shown on the Drawings and described in these Specifications. 2. The work shall include, but not limited to the following as shown on the Plans and described in these Specifications Online Q&A Yes Q&A Deadline 03/27/2025 2:00 PM (PDT)Questions or comments regarding this specification must be submitted electronically to our eBid system where the specification was downloaded and must be received by the Port Questions received after the date stated here will not be accepted. Emails and faxes will not be accepted. License Requirements A or C-12 Bid Valid 120 Calendar Days Liquidated Damages $500.00 Per Calendar Day Estimated Bid Value $335,000.00 Start/Delivery Date July 2025 Project Duration 60 Calendar Days Scope of Work: 1. Furnish all labor, materials, equipment, supplies, transportation, and disposal as necessary to complete the construction of Sand Replenishment at Kellogg Beach FY 2025 as shown on the Drawings and described in these Specifications. 2. The work shall include, but not limited to the following as shown on the Plans and described in these Specifications a. Furnishing and placing of approximately 2,200 cubic yards of sand fill material (natural washed sand fill) on the Kellogg Beach as shown on the drawings and specified. b. Contractor's access to the site, including temporarily removal of chain, removal and disposal of galvanized post, sawcut and remove portion of concrete wall as necessary for equipment access. After sand placement restore wall to match existing including painting and install new removable galvanized post. Protect existing concrete sidewalk, curb, gutter, storm drain, fence, landscaping, and other existing structures. c. Placement of sand fill shall be performed by a land-based equipment. d. Implementation and maintenance of Best Management Practices including the use of silt curtain during sand placement. e. Installation of pole mounted live streaming Webcam that shall be accessible to the public and the District. Contractor shall collect and disseminate a daily video recording of the construction work in the field to document construction progress. Contractor to submit the video as part of the daily report. The contractor shall submit the video in MP4, AVI, or WMV format

Award

Water / Sewer

$222,000.00

Public - County

Paving, Site Work

4

19

10

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
274
Active Projects
132
Bidding Soon
1,606
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2025

May 12, 2025

Project location map

353 San Antonio Ave, San Diego, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.