Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 26, 2025 at 7:00 PM
Updated December 27, 2025
Site work and paving for a mixed-use development in Avondale, Arizona. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; bridge / tunnel; and bridge / tunnel.
The project will develop and enhance trail connections throughout the City, establishing a continuous multi-use path system extending from Friendship Park to Festival Fields along the river and utility corridors. Specifically, it will link the existing multi-use path along the Agua Fria River, connecting Festival Fields Park to existing trails north of Lower Buckeye Road, adjacent to the Tres Rios Landing neighborhood. The project includes the installation of a HighIntensity Activated Crosswalk (HAWK) signal at Lower Buckeye Road to improve pedestrian and cyclist safety. Per the adopted Active Transportation Plan, expanding the trail network will enhance outdoor recreational opportunities and improve accessibility to key City assets. As of December 26, 2025, this project is in the conceptual phase. Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$2,498,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
Multiple Locations, Avondale, AZ
Related To This Project
Avondale, AZ
Bid Date: Feb 10 2026
Avondale, AZ
--
Avondale, AZ
--
Avondale, AZ
--
Avondale, AZ
Bid Date: Feb 20 2026
Avondale, AZ
Bid Date: Jan 12 2026
Avondale, AZ
Bid Date: Dec 03 2025
Avondale, AZ
Bid Date: Dec 05 2025
Avondale, AZ
Bid Date: Nov 18 2025
Avondale, AZ
--
Avondale, AZ
Bid Date: Oct 16 2025
Supply and Delivery of Concrete Materials, Sand, Decorative Rock and Road/Subbase Material - 5886879
Avondale, AZ
Bid Date: Sep 11 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
