Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 28, 2025 at 8:00 PM
Updated April 29, 2025
Site work and paving for a mixed-use development in West Bend, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
Significant types of work and approximate quantities include: 24-Hour Emergency Response Mobilization Saw Cutting Remove and Replace 24-lnch Concrete Curb and Gutter Remove and Replace 4-lnch Concrete Sidewalk Remove and Replace 6-lnch Concrete Sidewalk Furnish and Place Asphalt Pavement Patch Furnish and Place Concrete Pavement Patch Furnish and Place Topsoil, Seed, Fertilizer, Mulch and Water 3 EA 1000 LF 200 500 750 300 100 200 LF SF SF TN SY Sy All questions regarding the project shall be directed to Mitch Leisses of Kunkel Engineering Group at (920) 210-6330 or mleisses@geo-logic.com The City of West Bend, Wisconsin, reserves the right to reject any or all bids, subject to the provisions of Sections 62.15 and 66.0901 of the Wisconsin Statutes. No bid shall be withdrawn foraperiod of 60 days after the scheduled time of opening bids. The letting of work described herein is subject to the provisions of Section 66.0901 Wisconsin Statutes, as it applies to work done under this contract. 1 No bid will be accepted unless accompanied by an uploaded Bid Bond or electronic Surety2000 bid bond equal to 5% of the bid, payable to the City of West Bend, Wisconsin, as a guarantee that, if the bid is accepted, the successful bidder will execute and file the contract and payment and performance assurances, forming a part of the Specifications, within 10 days after the award of the contract. The payment and performance assurances must be for an amount at least equal to the contract price and must be in the form of a bond, an irrevocable letter of credit, or an escrow account acceptable to the City. In case the bidder fails to file such contract, performance bond, and payment bond, the amount of the bid bond shall be forfeited to the City as liquidated damages (Section 62.15(3) of Wisconsin Statutes).
Award
Sidewalks / Parking Lot
$117,350.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 4, 2025
May 5, 2025
Multiple Locations, West Bend, WI
Related To This Project
West Bend, WI
Bid Date: Apr 04 2025
West Bend, WI
Bid Date: Apr 16 2025
West Bend, WI
Bid Date: Jul 23 2021
West Bend, WI
Bid Date: Jul 26 2019
West Bend, WI
--
West Bend, WI
Bid Date: Jun 18 2025
West Bend, WI
Bid Date: Jun 13 2025
West Bend, WI
Bid Date: Jun 12 2025
West Bend, WI
Bid Date: Mar 19 2025
West Bend, WI
Bid Date: Mar 31 2025
West Bend, WI
Bid Date: Mar 17 2025
West Bend, WI
--
West Bend, WI
Bid Date: Mar 24 2025
West Bend, WI
Bid Date: Feb 25 2025
West Bend, WI
Bid Date: Feb 28 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
