Published April 23, 2025 at 8:00 PM

Updated April 24, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Jackson, Missouri. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The project consists of furnishing all labor, tools, equipment and materials for construction of replacement bridge including removal of the existing bridge and improvements, excavation and embankment construction, rock excavation, reinforced concrete end bent construction, furnishing and placement of precast, prestressed concrete deck beams, rip rap placement, approach road construction and surfacing, guardrail, restoration of adjacent grades, seeding and mulching and any other associated items to complete the project. A certified or cashiers check or a bid bond in the amount of 5% shall be submitted with each proposal. The project will be awarded to the lowest, responsive, responsible bidder. The Owner reserves the right to waive all informalities, with MoDOT concurrence, not involving price, time or changes in work and to negotiate contract terms with the Successful Bidder. The prime contractor must go through MoDOT pre-qualification process and be on the MoDOT approved contractor listing. The prime contractor must have a fully responsive contractor questionnaire on file with the Missouri Highways and Transportation Commission (MHTC) at least seven (7) days prior to the date and hour of the bid opening (See Section 102.2 of the Missouri Standard Specifications for Highway Construction, January 1, 2025 Edition). The prime contractor on a project must perform, with its own staff, contract work amounting to NOT less than 30% of the total original contract price. The right is reserved to reject any or all bids by the City of Jackson, Missouri, with MoDOT concurrence. The DBE Goal for the BRO-R219(001) project is 4.0%. No 2nd tier subcontracting will be allowed on this project. MO DOT - Bridge No. 215005 Replacement

Award

Bridges / Tunnels

$407,051.00

Public - City

Demolition, New Construction, Paving, Site Work

25

8

6

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
56
Bidding Soon
664
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2025

June 16, 2025

Project location map

To Be Determined, Jackson, MO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.