BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 29, 2025 at 8:00 PM

Updated July 30, 2025

Site work, new construction and renovation of a detention facility in East Lyme, Connecticut. Completed plans call for the construction of a 120-square-foot detention facility; for the renovation of a detention facility; and for site work for a detention facility.

Large Animal Barn Restroom at York Correctional Institute 201 West Main Street Niantic CT BI-HH-50 The Project Description: 1. Construction of a building of approximately 120 gross square feet. 2. The building is new and shall be prefabricated and constructed of materials that include but are not limited to the following: The structure shall consist of steel framing. Exterior wall construction shall consist of 14 Gauge or heavier mechanical tube mig-welded with 16 ga. minimum interior and exterior galvannealed steel panels. Insulated with closed cell spray foam to create class 3 vapor retarder, minimum R16. Flat panelized roof construction shall consist of 3" sandwich panels clad with gypsum. Both sides shall be stucco-embossed aluminum pre-painted white. The core shall be of 1 lb. density polystyrene foam. Fascia shall be 5" high with gutter and downspout(s). Foundations shall consist of cast-in-place reinforced concrete. Interior finishes include walls painted using a prime-to-paint system manufacturer's epoxy primer with a urethane finish. Floor coverings include aluminum treadplate. Ceilings shall be metal ceiling panels. 3. The Authorities Having Jurisdiction for Threshold Projects, Non-Threshold Projects, and/or Connecticut State University System (CSUS) 2020 Projects, as defined by the Connecticut General Statutes, are the Connecticut Department of Administrative Services (DAS) / Construction Services (CS) Office of State Building Inspector (OSBI) and Office of State Fire Marshal (OSFM). Cost Estimate Range: $ 189,973.00 To $ 199,972.00 Prevailing Wages: This is a Prevailing Wages Project Contract Time Allowed: Calendar Days: 150 Liquidated Damages: $ 688.00 Per Calendar Day Beyond Substantial Completion. $ 687.00 Per Calendar Day Beyond 90 days After Substantial Completion. Contact Information Sam Davis 450 Columbus Blvd Hartford CT, 06103 United States Sam.Davis@ct.gov All Project Questions, Bid Questions, and Pre-Bid Equals and Substitution Requests must be submitted fourteen (14) Calendar Days prior to the Bid Due Date. All Project Questions and Pre-Bid Equals and Substitution Requests must be emailed (not phoned) to the Architect/Engineer with a copy to the Construction Administrator and the Project Manager. Architect/Engineer: DAS Construction Services Email: Sam.Davis@ct.gov. Project Manager: Sam Davis Email: Sam.Davis@ct.gov. All Bid Questions must be emailed to the Procurement Unit Procurement Unit: Alison Kulas Email: Alison.Kulas@ct.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 25% of the total state-funded value with DAS-certified Small Businesses and 6.25% of the total state-funded value with DAS-certified Minority-, Women-, and/or Disabled-owned Businesses Question Deadline 04/18/2025

Post-Bid

Jails / Prisons

$199,972.00

Public - State/Provincial

New Construction, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
630
Active Projects
337
Bidding Soon
4,323
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

October 2, 2025

Project location map

201 W Main St, East Lyme, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.