Site work for a civil project in Union City, California. Completed plans call for site work for a water / sewer project.

**As of May 12th, the project was awarded to AES Industrial Inc., with an awarded amount of $1,673.418.** Reference Number 0000380172 Issuing Organization Union Sanitary District Owner Organization Union Sanitary District Project Type RFB - Request for Bid (Formal) Project Number 800-612 Title Primary Scum Pipeline Replacement Project Source ID PU.AG.USA.2531706.C15456326 Details Location United States, California, Alameda County Job Location 5072 Benson Rd, Union City, CA 94587 Piggyback Contract No Description Notice is hereby given that sealed bids will be received by the Union Sanitary District in their office located at 5072 Benson... See more Dates Publication 03/18/2025 10:19 AM EDT Bid Intent Not Available Question Acceptance Deadline 04/08/2025 05:00 PM EDT Questions are submitted online No Closing Date 04/15/2025 05:00 PM EDT Prebid Conference 03/25/2025 03:00 AM EDT Contact Information Lupita Leon 510-477-7605 lupital@unionsanitary.ca.gov Pre-Bidding Events Event Type Prebid Conference Attendance Recommended Event date 03/25/2025 03:00 AM EDT Location Zoom Event Note A non-mandatory virtual prebid conference call will be held at 10:00 a.m. local time on March 25, 2025. ... Description Notice is hereby given that sealed bids will be received by the Union Sanitary District in their office located at 5072 Benson Road, Union City, CA 94587-2508, at any time prior to 2:00:00 p.m. local time on April 15, 2025, for furnishing all labor, materials, equipment, and services for the construction of improvements designated as: Primary Scum Pipeline Replacement Project (Project No. 800-612) The project replaces the existing primary scum pipeline from the East and West Primary Clarifier buildings to the Thickener Control Building. To accomplish this work the Contractor shall complete the work items indicated in the Contract Documents, including but not limited to the following: Question Deadline 04/08/2025 at 2:00 PM PT Questions are submitted online No Questions concerning this project should be directed to: Union Sanitary District Attn: Lupita Leon 5072 Benson Road Union City, CA 94587 Phone: 510-477-7605 Demolition and removal of existing primary scum piping along the alignment of the new primary scum line. Fill the existing primary scum line with flowable fill where the alignment of the existing line does not overlap with the new piping. Procure and install new primary scum piping as shown. Modify existing grade to accommodate new primary scum piping alignment. Complete all testing, startup, and commissioning. The successful bidder will have three hundred ninety-two (392) calendar days to complete the Project from the Notice to Proceed. The Engineer's Estimate for this Project is $1,708,000. Each bid must conform and be responsive to the invitation, the Plans and Specifications, and all documents comprising the Contract Documents. Each bid shall be presented under sealed cover and shall be accompanied by a certified check or bidder's bond, made payable to the District, in an amount not less than ten percent (10%) of the bid. The said check or bidder's bond shall be given as a guarantee that the successful bidder will execute the contract in conformity with the form of agreement contained within the contract documents, and will furnish bonds and insurance policies as specified within ten (10) days after notification of the award of the Contract to the successful bidder. Cost for work described in each addenda issued during the time of bidding shall be included in the Bid and the addenda shall become a part of the Contract documents. The project replaces the existing primary scum pipeline from the East and West Primary Clarifier buildings to the Thickener Control Building. To accomplish this work the Contractor shall complete the work items indicated in the Contract Documents, including but not limited to the following: Demolition and removal of existing primary scum piping along the alignment of the new primary scum line. Fill the existing primary scum line with flowable fill where the alignment of the existing line does not overlap with the new piping. Procure and install new primary scum piping as shown. Modify existing grade to accommodate new primary scum piping alignment. Complete all testing, startup, and commissioning. The successful bidder will have three hundred ninety-two (392) calendar days to complete the Project from the Notice to Proceed

Award

Water / Sewer

$1,673,418.00

Public - City

Site Work

12

19

39

9

Subscribe For Documents

63 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
409
Active Projects
148
Bidding Soon
3,192
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2025

June 16, 2025

Project location map

5072 Benson Rd, Union City, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.