Published April 1, 2025 at 8:00 PM
Updated October 1, 2024
Site work and paving for a transportation facility in San Bernardino, California. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
Reconstruct Portion of Taxiway A Project In general, the work for this project includes removal of existing pavement, excavation and subgrade preparation, preparation and compaction of aggregate base material, construction of stabilized base course, construction of Portland cement concrete pavement, construction of hot mix asphalt concrete pavement, concrete pavement joint resealing, removal and application of pavement markings, and airfield electrical. Liquidated Damages $500 / Day & $1,000 / Hour (for any interruption to airport utilities and reopening of the airfield) Project Duration 120 Calendar Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 04/01/2025 10:00 AM (PDT) Goals for female participation in each trade: 6.9%. (DBE) race-neutral goal of 8.1% The Project includes reconstruction of the failing Portland Concrete Cement (PCC) portions of Taxiway A between the parallel Taxiway A and Runway 24 threshold (Exhibit A). This section of the taxiway is approximately 400 feet long, 75 feet wide, and 18 inches deep and has an accompanying fillet section, for a total PCC section of approximately 39,000 square feet. The average Pavement Condition Index (PCI) for the Project area is 67. Duration of base bid work is 120 calendar days. The following phases are listed in sequential order. Phase 1A/1B Runway 6-24 will be closed for the purpose of relocating the threshold 844 feet to the west, see Exhibit A. During this phase the following existing runway 24 markings will be covered or obliterated: o Runway 24 aiming points o Runway 24 touchdown zone markings o Runway 24 designator o Runway center line markings o Runway 24 threshold markings The following temporary markings will be installed: o Runway 24 threshold bar o Runway 24 designator o Runway 24 aiming points o Runway 24 blast pad chevron markings o Runway center line markings Runway lights and signs will be reconfigured to reflect the reduced runway length, that includes renumeration of Runway Distance Remaining (RDR) signs, relocating Runway 6 amber lights in the last 2,000-feet of runway, and covering runway lights within the closed 844-feet of Runway 6/24. Temporary threshold and runway end lights will be installed at the relocated threshold. Runway 24 PAPI's will be disabled. Runway End Identified Lights (REILs) will be disabled. Runway 24 designator will be covered. Low-profile barricades will be placed at each taxiway/runway intersection for the closure. Phase 2 The Runway 24 threshold will be relocated 844-feet during this phase of construction, and declared distances for each runway end will be in effect. Runway 24 TORA/TODA/LDA/ASDA will be 9,156-feet. Runway 6 TORA/TODA/LDA/ASDA will be 8,756- feet. Taxiway A east of Taxiway E will remain closed throughout the duration of the Project (120 calendar days). See Exhibit C. Phase 3A/3B Runway 6-24 will be closed for the purpose of returning the runway to full length. During this phase the following temporary Runway 24 markings will be obliterated. See Exhibit D o Temporary Runway 24 threshold o Temporary Runway 24 aiming points o Temporary Runway 24 designator o Temporary blast pad chevron markings o Temporary runway center line markings The following permanent markings will be installed or uncovered: o Runway 24 aiming points o Touchdown zone markings o Runway centerline markings o Runway 24 designator Runway lights and signs will be reconfigured to reflect the full length runway, including renumeration of Runway Distance Remaining (RDR) signs, relocating Runway 6 amber lights in the last 2,000-feet of runway, and uncovering runway lights within the closed 844- feet of Runway 6/24. Temporary threshold and runway end lights will be removed. Runway 24 PAPI's will be enabled. Runway 24 REILs will be enabled. Low-profile barricades will be removed at each taxiway/runway intersection and from across the runway. Taxiway A east of Taxiway E will be re-opened.
GC Bidding
Transportation Terminals
$4,000,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 04 - Masonry
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 11 - Equipment
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 8, 2025
June 9, 2025
Multiple Locations, San Bernardino, CA
Related To This Project
San Bernardino, CA
Bid Date: Apr 16 2025
San Bernardino, CA
Bid Date: May 05 2025
San Bernardino, CA
Bid Date: Apr 15 2025
San Bernardino, CA
Bid Date: Mar 25 2025
San Bernardino, CA
Bid Date: Apr 08 2025
San Bernardino, CA
Bid Date: Apr 04 2025
San Bernardino, CA
Bid Date: Jul 18 2019
San Bernardino, CA
Bid Date: Aug 08 2019
San Bernardino, CA
Bid Date: Mar 18 2025
San Bernardino, CA
--
San Bernardino, CA
Bid Date: Mar 20 2025
San Bernardino, CA
Bid Date: Apr 04 2025
San Bernardino, CA
Bid Date: Mar 05 2025
San Bernardino, CA
Bid Date: Mar 18 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.