Published April 12, 2025 at 8:00 PM
Updated April 24, 2025
Site work and paving for a road / highway in Concord, Vermont. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Architect and Engineering (Non-Building), Construction (Non Building), Road Construction. This will be done in a design-build format, includes 5 separate projects. Send contact and email address of those planning on attending the pre-bid meeting to Matt Young at myoung@ascentconsultingllc.com RFI Close 04/09/25 4pm EDT Scope of Work The scope of work has been separated into five projects. Project-1 Culvert #4 Mountain Brook-Ridge Rd. Project-2 Box Culvert #6 Barnes Brook-Town Hall Rd. Project-3 Box Culvert #15 Sheldon Brook-N. Kirby Rd. Project-4 Brook Rd. Project-5 Ridge Rd. The scope of work for all the projects includes design, permitting and construction and as described by the attachments. All culverts must include wing walls at the inlet and outlet. Project-1 Culvert #4 Mountain Brook-Ridge Rd.: This culvert location is over Mountain Brook. This was formerly a concrete box culvert on Ridge Rd. was completely washed away. VTrans Hydraulic Study dated 11/26/2024 offers three possible solutions. This work consists of the installation of a culvert and related road repairs and guardrails. All culverts must include wing walls at the inlet and outlet. A. Option-A: A metal box with an inside opening span of 14'-4" and minimum height of 8'-4". The box invert should be buried 2 feet. This will result in a clear height of 6'-4" above streambed, providing 71 square feet of waterway area. Bed retention sills should be added and filled as described for the concrete box above. This structure results in a headwater depth of 3.8 feet at 2% AEP and 4.5 feet at 1% AEP. B. Option-B: A corrugated metal plate pipe arch with a clear span of 169.4 inches and height of 105.2 inches. The invert should be buried 2 feet. This will result in a clear height of 6.8 feet above streambed, providing 75 square feet of waterway area. Bed retention sills need to be added and filled as described for the concrete box above. This structure results in a headwater depth of 3.9 feet at 2% AEP and 4.6 feet at 1% AEP. C. Option-C: Aluminum culvert can be considered with wing walls at inlet and outlet Project-2 Box Culvert #6 Barnes Brook-Town Hall Rd.: This location is over Barns Brook which was destroyed. VTrans Hydraulic Study dated 11/26/2024 offers four possible solutions. In addition to the options below, guardrails will be required per each side of the culvert and road. A. Option-A: A metal box with an inside opening span of 18'-9" and minimum height of 8'-9". The box invert should be buried 2 feet. This will result in a clear height of 6'-9" above streambed, providing 110 square feet of waterway area. Bed retention sills need to be added and filled as described for the concrete box above. This structure results in a headwater depth of 4.1 feet at 4% AEP and 4.6 feet at 1% AEP. B. Option-B: An open bottom arch with a minimum clear span of 18 feet and clear height of 7.7 feet, providing a waterway area of 104 square feet. The bottom of abutment footings should be pinned to bedrock to prevent undermining. This structure results in a headwater depth of 3.8 feet at 4% AEP and 5.3 feet at 1% AEP. C. Option-C: Aluminum culvert can be considered with wing walls at inlet and outlet. Project-3 Box Culvert #15 Sheldon Brook-N. Kirby Rd.: This location is over Sheldon Brook which was destroyed. VTrans Hydraulic Study dated 8/26/2024 offers three possible solutions. In addition to the options below, guardrails will be required per each side of the culvert and road. A. A metal box with an inside opening span of 12'-8" and minimum height of 8'-0". The box invert should be buried 2 feet. This will result in a clear height of 6'-0" feet above streambed, providing 56
Post-Bid
Roads / Highways
$160,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 23, 2025
June 21, 2025
Multiple Locations, Concord, VT
Related To This Project
Concord, VT
--
Concord, VT
Bid Date: Apr 18 2024
Sunderland, VT
Bid Date: Apr 16 2025
Middlebury, VT
Bid Date: Apr 17 2025
Waterbury, VT
Bid Date: Apr 25 2025
Williston, VT
Bid Date: Apr 08 2025
Grafton, VT
Bid Date: Apr 01 2025
Williston, VT
Bid Date: Apr 03 2025
Chester, VT
Bid Date: Apr 21 2025
Williston, VT
--
Town of Rockingham, VT
Bid Date: Apr 01 2025
Waitsfield, VT
--
Chester, VT
Bid Date: Apr 18 2025
Fair Haven, VT
Bid Date: Apr 07 2025
Burlington, VT
Bid Date: Dec 13 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.