BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2025 at 8:00 PM

Updated June 7, 2025

Site work and new construction of a fire / police facility in Mather, California. Working plans call for the construction of a 10,148-square-foot fire / police facility; and for site work for a fire / police facility.

The owner has determined a prequalified list of general contractor. I only added 2 quailified conractors. The Project includes construction of a 10,148 SF one-story fire station with three (3) apparatus bays and eight (8) dormitories, a storage/truck wash building, emergency standby generator, civil and utility sitework, and other related items, developed on a 4.77-acre site. The Sacramento Metropolitan Fire District (hereinafter Metro Fire or District) has determined that all bidders on the Fire Station 67 Construction public works project (Project) to be undertaken by the District must be pre-qualified prior to submitting a bid for the Project. It is mandatory that all Contractors who desire to submit a bid for the Project fully complete the Request for Qualifications (RFQ) process, provide all materials requested herein, and be approved by the District to be on the final Qualified Bidders List. No bid will be accepted from a Contractor that has failed to comply with these requirements. If two or more entities desire or expect to submit a bid as part of a Joint Venture, each entity within the Joint Venture must be separately qualified to bid through this RFQ process. The bid solicitation process for the project is anticipated for Summer 2025. Construction is anticipated to begin in Fall 2025 and last for 14 months. Question Deadline 04/07/2025 at 12:00 PM PT Question Response Deadline: April 11, 2025, 4:00pm

Final Planning

Fire / Police

$12,900,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
495
Active Projects
243
Bidding Soon
2,565
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2025

September 1, 2025

Project location map

To Be Determined, Mather, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.