BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 1, 2025 at 8:00 PM

Updated May 7, 2025

Site work for a transportation facility in Klamath Falls, Oregon. Completed plans call for site work for a transportation facility.

All questions regarding the Plans and Specifications must be submitted electronically, on or before 12:00 P.M. 4/25/2025 Engineers Estimate Range: $7,000,000 to $8,500,000 the City of Klamath Falls Provides a Written Response to Each Timely Protest, Denying the Protest and Affirming the Award. On All Projects, Work Performed by the Contractor's Own Organization Must Be at Least 30% of the Awarded Contract Amount. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. ORANG Repair Aircraft Shelter B325 Work shall include, but not necessarily be limited to: Installation of a water sprinkler fire suppression system; Repairs &upgrades to building,electrical, HVAC, & lighting systems; Installation of a certified lightning protection system;Installation of an intrusion detection system; Seismic upgrades; Refurbishment of hangarbay doors; Installation of adjacent fire utility building & associated components. 1. add wash and paint interior walls and ceiling 2. add wash and paint exterior metal wall panels and cmu 3. add demolition of existing fire suppression system 4. remove restroom fixtures and accessories

Post-Bid

Transportation Terminals

$8,500,000.00

Public - City

Site Work

122

45

4

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
8
Bidding Soon
83
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2025

July 7, 2025

Project location map

3000 Airport Way, Klamath Falls, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.