Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 7, 2025 at 8:00 PM
Updated June 21, 2025
Site work and paving for a mixed-use development in Milton, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; bridge / tunnel; bridge / tunnel; and water / sewer project.
Counties: Santa Rosa Road Name: SR 10 (US 90) - Resurfacing Limits: 58010000 Project(s): 22036025201(*) Federal Aid No: N/A Project(s): 22036025202 Federal Aid No: N/A Total Roadway Length: 11.032 Miles Total Bridge Length:0.331 Miles Total Proposal Length: 11.032 Miles Contract Days: 340 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Day Flexible Please read the full advertisement Description: The Improvements under this District Contract for FPID 220360-2-52-01 consist of milling and resurfacing, base work, shoulder treatment, drainage improvements, curb & gutter, highway signing, guardrail, pavement markings, and other incidental construction on SR 10 (US 90) from Escambia River Bridge to East of CR 197A (Woodbine Rd.) in Santa Rosa County. FPID 220360-2-52-02 consists of bridge joint replacement on Bridge Nos. 580002, 580004, 580007, 580052, and 580054. Pre-qualification is Required to Bid on This Contract Marine General Liability Insurance as referenced in Section 7-13.5 of the FDOT Standard Specifications may be required if any work under this Contract is performed using vessel(s)*. Prior to the Contract execution, Contractor shall provide written certification to the Department if no vessel(s) will be used for the work. * Vessel: a watercraft or other artificial contrivance, whether motorized or non-motorized, used to perform some or all of the work, as well as any incidental work related to the project, which includes, but is not limited to, barges, dredges, mobile offshore drilling units, floating cranes, tugboats, ferries, and any watercraft used to transport construction workers, materials, or equipment at the project Question Deadline 05/01/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 002 - Resurfacing - SR 10 (US 90)
Award
Roads / Highways
$5,252,799.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2025
July 7, 2025
FL-10, Milton, FL
Related To This Project
Milton, FL
Bid Date: Apr 28 2025
Milton, FL
Bid Date: May 12 2025
Milton, FL
--
Milton, FL
--
Milton, FL
Bid Date: Jun 13 2025
Milton, FL
Bid Date: May 08 2025
Milton, FL
Bid Date: Apr 30 2025
Milton, FL
Bid Date: Mar 18 2025
Milton, FL
Bid Date: Apr 10 2025
Milton, FL
Bid Date: Apr 10 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
