BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2026 at 7:00 PM

Updated January 31, 2026

Site work for a water / sewer project in Monroe, Michigan. Completed plans call for site work for a water / sewer project.

Mobilize dredging equipment to Monroe Harbor and perform mechanical dredging due to the presence of boulders, rocks, and clay-like material. Dredging will achieve depths of 23 feet below Low Water Datum (LWD) plus 1-foot overdepth or point of refusal, whichever is less, within the main channel from STA 60+00 to 76+00, 0+00 to 20+00 river, and 0+00 to 20+00 lake. A section near the wall from STA 15+75 to 4+00 will be dredged to 20 feet below LWD plus 1-foot overdepth or point of refusal, and the turning basin from STA 64+72 to 79+00 will also be dredged to 20 feet below LWD plus 1-foot overdepth or point of refusal. All dredged material will be placed in Cell 3 at Pointe Mouillee Confined Disposal Facility (CDF), with no discharge allowed at the CDF. Demobilize upon completion of dredging. Contractors must comply with security requirements, including initial and annual security awareness training, suspicious activity reporting, and adherence to Force Protection Condition (FPCON), Random Antiterrorism Measures (RAMs), and Health Protection Condition (HPCON) protocols. Personnel requiring unescorted access to DoD installations will undergo vetting through NCIC-III and TSDB checks and comply with identity verification requirements. Contractors must also use the E-Verify program for employment eligibility verification and maintain records of verified candidates. The Bidder Inquiry System will stop receiving new inquiries ten (10) calendar days before the bid due date in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary. Question Deadline 01/12/2026 IN ACCORDANCE WITH FAR 36.204, DISCLOSURE OF MAGNITUDE OF CONSTRUCTION PROJECTS, THE MAGNITUDE OF CONSTRUCTION FOR THIS REQUIREMENT IS BETWEEN $1,000,000 AND $5,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$1,781,015.00

Public - Federal

Site Work

11

8

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
508
Active Projects
301
Bidding Soon
2,663
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2026

May 18, 2026

Project location map

To Be Determined, Monroe, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.