Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 28, 2025 at 8:00 PM
Updated April 29, 2025
Site work for a mixed-use development in Redwood City, California. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.
The City of Redwood City is soliciting bids for the Mitchell & Fair Oaks Field Synthetic Turf Replacement Project. The work of this project consists generally of replacement of two synthetic turf soccer fields and one baseball infield, including the associated synthetic turf product, infill material, drainage/shock pad, and infield drainage system; also, associated concrete edge-band removal, fence removal, and fine grading. At Red Morton Park, work on Mitchell Field includes, without limitation, removal and disposal of approximately 90,900 square feet of existing synthetic turf and approximately 10,700 square feet of existing clay infield, along with minor concrete edge-band, fence, and irrigation removal. Installation involves approximately 101,600 square feet of new synthetic turf material for both the soccer and baseball fields, including the synthetic turf product, infill material, drainage/shock pad, infield drainage system and connection to existing City drainage system, and fine grading. At Fair Oaks Field, work includes, without limitation, removal and disposal of approximately 71,150 square feet of existing synthetic turf. Installation involves approximately 71,150 square feet of new synthetic turf material, including the synthetic turf product, infill material, drainage/shock pad, minor concrete edge-bands, and fine grading. The work of this project consists generally of: without limitation, replacement of two synthetic turf soccer fields and one baseball infield, including the associated synthetic turf product, infill material, drainage/shock pad, and infield drainage system; also, associated concrete edge-band removal, fence removal, and fine grading. Contract Documents fully describe the Work.
Award
Playgrounds / Parks / Athletic Fields
$2,198,863.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 23, 2025
June 23, 2025
Multiple Locations, Redwood City, CA
Related To This Project
Redwood City, CA
Bid Date: May 08 2025
Redwood City, CA
--
Redwood City, CA
Bid Date: May 23 2025
Redwood City, CA
Bid Date: May 21 2025
Redwood City, CA
--
Redwood City, CA
Bid Date: Jun 04 2025
Redwood City, CA
Bid Date: Jul 01 2025
Redwood City, CA
Bid Date: Apr 25 2025
Redwood City, CA
Bid Date: Apr 11 2025
Redwood City, CA
--
Redwood City, CA
Bid Date: Apr 23 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
