BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Redwood City, California. Design plans call for site work for a water / sewer project.

As of April 10, 2026, an engineer has been selected for the project. A firm timeline for bidding and construction has not been established. *The closed solicitation has been included below for reference: The City of Redwood City (City) is located on the southwest shore of the San Francisco Bay on the San Mateo Peninsula in California. The City's Engineering and Transportation and Public Works Services Departments are responsible for maintaining the City's infrastructure, including its storm drainage system, sewer system, water systems, roads and bridges, flood channels, levees, and natural creeks. These departments also work to protect citizens from flooding while preserving the natural environment. The Redwood Creek begins in Woodside, California, and crosses the City of Redwood City until it discharges to several side channel sloughs into the Bay of San Francisco. Redwood Creek and its tributaries comprise about 8 miles of waterway and convey storm water run-off from the Emerald Hills and nearby watersheds to San Francisco Bay through Redwood City. Several of these creeks were lined with concrete in the late 1960's as part of the creek improvements funded by the General Improvement District 1-65. Over time, these concrete creek wall structures require repair. The City of Redwood City is seeking a qualified engineering firm to develop the design, plans, specifications, and cost estimates for the "Redwood Creek Channel Rehabilitation Project Near 1180 Main Street Project" (project). This project aims to design rehabilitation measures between stations 295+30 to station 297+00 as shown in the Redwood Creek Channel Structural Assessment performed by Wood Rodgers and report dated May 12, 2023. One wall segment between stations 295+30 and 295+60 was replaced in November 2020. See figure 1 for the project location map, and record drawings of the original channel construction (as-builts) in the attachment section of this RFP.

Design

Water / Sewer

$8,621,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
415
Active Projects
185
Bidding Soon
3,353
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2026

Project location map

1180 Main St, Redwood City, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.