BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 30, 2025 at 8:00 PM

Updated May 31, 2025

Site work for a playground / park / athletic field in Cleveland, Ohio. Conceptual plans call for site work for a playground / park / athletic field.

As of May 29, 2025, this project is in the conceptual phase. An engineer has not been selected. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: The Cleveland Metropolitan School District (CMSD) is interested in a full depth replacement of the existing 2014 Robert Bump Taylor track with a new 8-lane polyurethane track, creating a new discus area with fencing, adding security cameras and a sound system. Engineering services will include a Geotech report and topographical surveys permitting and construction administration. The District intends to select organizations to provide high quality Engineering Services for Bump Taylor Field. To facilitate submission and evaluation of proposals, the following provides relevant background information, scope of work requirements, and instructions for services providers to submit their proposal responses to this RFP. The Cleveland Metropolitan School District (CMSD) is interested in a full depth replacement of the existing 2014 Robert Bump Taylor track with a new 8-lane polyurethane track, creating a new discus area with fencing, adding security cameras and a sound system. Engineering services will include a Geotech report and topographical surveys permitting and construction administration. This will add to the districts limited portfolio of running tracks and athletic fields that exist in Cleveland. Cleveland is Ohio's third-largest public school district and serves more than 36,000 students. Along with providing a high-quality education, this site will house a high-quality athletic stadium. All final questions from service providers to the District:April 18, 2025, 3:00pm The contract period for this RFP will be May 30, 2025 through September 26, 2025. The method of Contractor Selection has not been Determined at this time.

Conceptual

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
106
Bidding Soon
2,009
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2026

Project location map

To Be Determined, Cleveland, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.