Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 16, 2025 at 8:00 PM
Updated May 17, 2025
Renovation of a civil project in Marlborough, Massachusetts. Completed plans call for the renovation of a water / sewer project.
SERVICES TO PROVIDE AND REPLACE 30" MANWAY AND 2" NOZZLE IN A SIDE ENTRY FRP TANK CONTAINING SODIUM HYPO CHLORITE AT AMIENT LOCATED AT THE JOHN CARROLL WATER TREATMENT PLANT PER ATTACHED SPECIFICATIONS Q And A Close: 04/22/2025 09:00:00 AM ANY QUESTIONS REGARDING THIS EVENT PLEASE CONTACT MELINA.LIMARDO@MWRA.COM A. The Contractor shall perform a complete inspection ofthe interior and exterior ofthe Fiberglass Reinforced Plastic Tank #5. The inspection shall include all fixtures and appurtenances to the tank. The follow ing are the tank manufacturer detailed in the included attachments. 1. Manufacturer: Augusta Fiberglass Co., Inc. 2. Serial Number: 51464-G For #5 3. Capacity: 12,000 Gallons 4. Height: 15.5 Feet 5. Width: 12 Feet B. The Contractor shall furnish all labor, equipment, and supplies necessary to perform repair of Sodium Hypochlorite Storage Tank #5. As part ofthe repair process, the interior ofthe tank shall be ground to a solid substrate surface at the areas to be repaired. The solid substrate shall be tested to ensure an adequate bonding between the existing tank and new lining system. The Contractor shall reline the repair area in accordance with manufacturing standards AWWA D120-09 and ASME RTP-1-2013. C. The Contractor shall furnish all labor, equipment, and supplies necessary' to remove and replace one ( 1 ) manway and one (1) 2''flanged tank nozzle. The nozzles shall be a flush nozzle installation as defined in ASMERTP-1. D. The Contractor shall restore all existing repairs to a pre-work condition with a light grey finish to match the existing finish ofthe tank. E. Upon completion ofthe w ork, the Contractor shall clean the tank and leak test all repairs in accordance with AWWA D120-09 and ASME RTP-1-2013. F. The Contractor shall warranty any and all repairs and alterations to the tank for a period of one ( 1 ) year.
Award
Water / Sewer
$12,700.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 22, 2025
May 22, 2025
84 D'Angelo Dr, Marlborough, MA
Related To This Project
Marlborough, MA
--
Marlborough, MA
Bid Date: Jun 10 2025
Marlborough, MA
Bid Date: Jun 12 2025
Marlborough, MA
Bid Date: Jun 12 2025
Marlborough, MA
Bid Date: Jun 02 2020
Marlborough, MA
Bid Date: Jun 26 2025
Marlborough, MA
Bid Date: Jul 29 2025
Marlborough, MA
Bid Date: Jul 16 2025
Marlborough, MA
Bid Date: May 06 2025
Marlborough, MA
Bid Date: May 06 2025
Marlborough, MA
Bid Date: Apr 23 2025
Marlborough, MA
Bid Date: May 15 2025
Marlborough, MA
Bid Date: Apr 17 2025
Marlborough, MA
Bid Date: Apr 03 2025
Marlborough, MA
Bid Date: Mar 13 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
