BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 16, 2025 at 8:00 PM

Updated May 17, 2025

Renovation of a civil project in Marlborough, Massachusetts. Completed plans call for the renovation of a water / sewer project.

SERVICES TO PROVIDE AND REPLACE 30" MANWAY AND 2" NOZZLE IN A SIDE ENTRY FRP TANK CONTAINING SODIUM HYPO CHLORITE AT AMIENT LOCATED AT THE JOHN CARROLL WATER TREATMENT PLANT PER ATTACHED SPECIFICATIONS Q And A Close: 04/22/2025 09:00:00 AM ANY QUESTIONS REGARDING THIS EVENT PLEASE CONTACT MELINA.LIMARDO@MWRA.COM A. The Contractor shall perform a complete inspection ofthe interior and exterior ofthe Fiberglass Reinforced Plastic Tank #5. The inspection shall include all fixtures and appurtenances to the tank. The follow ing are the tank manufacturer detailed in the included attachments. 1. Manufacturer: Augusta Fiberglass Co., Inc. 2. Serial Number: 51464-G For #5 3. Capacity: 12,000 Gallons 4. Height: 15.5 Feet 5. Width: 12 Feet B. The Contractor shall furnish all labor, equipment, and supplies necessary to perform repair of Sodium Hypochlorite Storage Tank #5. As part ofthe repair process, the interior ofthe tank shall be ground to a solid substrate surface at the areas to be repaired. The solid substrate shall be tested to ensure an adequate bonding between the existing tank and new lining system. The Contractor shall reline the repair area in accordance with manufacturing standards AWWA D120-09 and ASME RTP-1-2013. C. The Contractor shall furnish all labor, equipment, and supplies necessary' to remove and replace one ( 1 ) manway and one (1) 2''flanged tank nozzle. The nozzles shall be a flush nozzle installation as defined in ASMERTP-1. D. The Contractor shall restore all existing repairs to a pre-work condition with a light grey finish to match the existing finish ofthe tank. E. Upon completion ofthe w ork, the Contractor shall clean the tank and leak test all repairs in accordance with AWWA D120-09 and ASME RTP-1-2013. F. The Contractor shall warranty any and all repairs and alterations to the tank for a period of one ( 1 ) year.

Award

Water / Sewer

$12,700.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
696
Active Projects
382
Bidding Soon
4,881
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2025

May 22, 2025

Project location map

84 D'Angelo Dr, Marlborough, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.