BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 15, 2026 at 8:00 PM

Updated May 20, 2026

Site work, renovation and addition to an educational facility in Lees Summit, Missouri. Completed plans call for site work for a 26,500-square-foot educational facility; for the renovation of a educational facility; and for the addition of a educational facility.

Adding a sixth-grade pod addition, as well as site work including parking and traffic flow. A continuation of the work started with the 2020 bond cycle integrating sixth grade into all LSR7 middle schools. A sixth grade “pod” addition aligns building design with the standards of our newest middle schools; program facility/infrastructure upgrades support dedicated grade-level spaces; improved traffic loops & access points enhance campus navigation. As of March 5, 2026, this project will commence shortlisted GC bidding shortly. Project will go out to bid March 13th, 2026. The plan room for bidding has not been selected. A firm timeline has not been established. Submit all questions about the Contract Documents to the Architect in writing. †Replies which modify the Documents will be issued to the Bidders of record as Addenda to the Drawings and Specifications, and will form a part of the Contract. †The Architect and the Owner will not be responsible for oral clarifications.Questions must be received by the Architect no later than (5) working days prior to the Bid opening date. †No Addenda will be issued less than two (2) days prior to the Bid opening date. Question Deadline 04/21/2026 Description: The project consists of phased additions and renovations to a 1973 era cast in place concrete middle school that will be occupied during construction. Site work includes a new drive entryway and parking area, stormwater basins with landscaping and an outdoor classroom. The addition includes 26,500 square foot classroom space for 6th grade pod and connecting circulation space. The heavy renovation area includes of 73,000 square feet of existing classrooms on the north side of the building, including new walls, doors, ceilings, stairs, clerestory windows and lightwells, mechanical, electrical, plumbing and fire protection. Other areas in the building will receive limited renovations and fire sprinklering.

Bid Results

Educational

$28,233,000.00

Public - City

Addition, Renovation, Site Work

271

33

199

4

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2026

June 29, 2026

Project location map

630 SW Persels Rd, Lees Summit, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.