Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 22, 2025 at 8:00 PM
Updated May 23, 2025
Site work and paving for a road / highway in Trade Lake, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of May 22, 2025, the project was awarded to Hopkins Sand & Gravel, with an awarded amount of $58,899.66.** Bids for final grade & paving for Cedar Point Road. Project: Work to be provided will consist of: o Final grade, water (if necessary) and compaction o Pavement - application of 2.5" compacted thickness of hot mix asphalt pavement on roadway with eleven (11) foot lanes. No segregation of pavement surface after each truckload. o An Engineer's Certification of 10-year design life for LRIP reimbursement documentation. o Contractors are to supply all labor, material, traffic control, signage, and Proof of Insurance. Bids must follow LRIP terms and conditions. All bids must include proof of insurance. Bid Rejections/Acceptance: Town reserves the right to reject any and all bids, waive any informalities in bidding, or to accept the bid which best serves the interests of the Town
Award
Roads / Highways
$58,900.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2025
June 5, 2025
Cedar Point Rd, Trade Lake, WI
Related To This Project
Trade Lake, WI
Bid Date: Apr 08 2025
Trade Lake, WI
Bid Date: Mar 11 2025
La Crosse, WI
Bid Date: May 01 2025
La Crosse, WI
Bid Date: May 01 2025
Lake Tomahawk, WI
Bid Date: May 22 2025
North Fond du Lac, WI
Bid Date: Apr 29 2025
Neenah, WI
Bid Date: Apr 29 2025
La Crosse, WI
Bid Date: May 01 2025
Green Bay, WI
Bid Date: May 01 2025
Laona, WI
Bid Date: May 14 2025
Bloomer, WI
Bid Date: Apr 22 2025
Sister Bay, WI
Bid Date: May 19 2025
Kenosha, WI
Bid Date: May 08 2025
Bellevue, WI
Bid Date: Apr 24 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
