Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 18, 2025 at 8:00 PM
Updated June 19, 2025
Site work and paving for a mixed-use development in Franklin Park, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
**As of June 17,2025, the project was awarded to Copenhaver Construction, Inc, with an awarded amount of $1,790,478.85.** Washington St Reconstruction & Pacific Ave Green Infrastructure Site Directions: Washington Street, North of Belmont Avenue and Pacific Avenue, West of 25th Avenue. Project Category Code: Sanitary Sewer (Gravity), Roadway Pavement Markings, Water Main (Repair/Replace) Rehabilitation, Sidewalks/Curbs/Gutters, Street/Roadway Reconstruction , Utility Street Construction and Excavation, Landscaping (Planting Projects), Sewer and Water Construction, ADA Curb Ramps, Traffic Control, Grade and Surface, Landscaping, Stormwater Improvements, Paving (Asphalt or Concrete). Description: project involves the installation of approximately 1,415 LF of 8" and 6" dia. ductile iron watermain and appurtenances, 520 LF of 1" copper water service, 880 LF of storm sewer improvements, 9 storm structures, 350 LF of 6" sanitary sewer service replacement, 1,277 LF of roadway improvements which includes 3,700 SY of asphalt paving, 2,200 LF of concrete curb & gutter, 1,900 SF of concrete sidewalk and 900 SY of rain garden bioretention areas within Village right-of-way meeting MWRD design standards. Work on the 9 separate rain garden areas includes approximately 900 CY earth excavation, 550 LF underdrain, and 800 native plants. The work on Pacific Ave is limited to 2 rain garden bioretention areas. The project also includes lead water service replacement which involves the removal and replacement of approximately 6 lead domestic water services, from the property line to the existing residence, with approximately 155 LF of 1" diameter type K copper tubing. The replacement of these services will also include interior residence restoration and asbestos abatement, if found. The Village reserves the right to extend the Bid Deadline from this date and time to accept Bids submitted after the Bid Deadline, as the Village, in its sole discretion, determines is in the best interest of the Village. Notwithstanding the foregoing, the Village reserves the right to defer, postpone, delay, or reschedule the Bid Opening for such time and to such date as the Village, in its sole discretion, determines is in the best interest of the Village. BID SECURITY: Bid Security in the amount of not less than five (5) percent of the Bid shall accompany each Bid in the form of bid bond, cash, certified check, cashier's check or draft payable to The Village of Franklin Park. The Village reserves the right to reject any and all Bids or award each schedule individually, to waive any informalities or technicalities in bidding, and to accept the Bid which best serves the interests of the Village. The Village shall, in its sole discretion, determine what does or does not constitute an informality or technicality, and, in submitting a Bid, the Bidder agrees to be bound by that determination. QUESTIONS REGARDING BIDDING DOCUMENTS: Questions about the project or Bid Documents should be addressed to Joe Webster from Smith LaSalle, Inc. at: jwebster@smithlasalle.com
Award
Roads / Highways
$1,790,479.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2025
July 7, 2025
Multiple Locations, Franklin Park, IL
Related To This Project
Franklin Park, IL
Bid Date: May 06 2025
Franklin Park, IL
Bid Date: May 06 2025
Franklin Park, IL
Bid Date: May 29 2025
Franklin Park, IL
Bid Date: Jun 03 2025
Franklin Park, IL
Bid Date: Aug 28 2025
Franklin Park, IL
Bid Date: Aug 14 2025
Franklin Park, IL
Bid Date: Aug 13 2025
Franklin Park, IL
Bid Date: Sep 08 2025
Franklin Park, IL
Bid Date: May 01 2025
Franklin Park, IL
Bid Date: Apr 10 2025
Franklin Park, IL
Bid Date: Mar 26 2025
Franklin Park, IL
Bid Date: Feb 25 2025
Franklin Park, IL
Bid Date: Jan 28 2025
Franklin Park, IL
Bid Date: Jan 13 2025
Franklin Park, IL
Bid Date: Jan 06 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
