Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 10, 2026 at 8:00 PM
Updated May 20, 2026
Site work for a water / sewer project in Redwood City, California. Design plans call for site work for a water / sewer project.
As of April 10, 2026, an engineer has been selected for the project. A firm timeline for bidding and construction has not been established. *The closed solicitation has been included below for reference: The City of Redwood City (City) is located on the southwest shore of the San Francisco Bay on the San Mateo Peninsula in California. The City's Engineering and Transportation and Public Works Services Departments are responsible for maintaining the City's infrastructure, including its storm drainage system, sewer system, water systems, roads and bridges, flood channels, levees, and natural creeks. These departments also work to protect citizens from flooding while preserving the natural environment. The Redwood Creek begins in Woodside, California, and crosses the City of Redwood City until it discharges to several side channel sloughs into the Bay of San Francisco. Redwood Creek and its tributaries comprise about 8 miles of waterway and convey storm water run-off from the Emerald Hills and nearby watersheds to San Francisco Bay through Redwood City. Several of these creeks were lined with concrete in the late 1960's as part of the creek improvements funded by the General Improvement District 1-65. Over time, these concrete creek wall structures require repair. The City of Redwood City is seeking a qualified engineering firm to develop the design, plans, specifications, and cost estimates for the "Redwood Creek Channel Rehabilitation Project Near 1180 Main Street Project" (project). This project aims to design rehabilitation measures between stations 295+30 to station 297+00 as shown in the Redwood Creek Channel Structural Assessment performed by Wood Rodgers and report dated May 12, 2023. One wall segment between stations 295+30 and 295+60 was replaced in November 2020. See figure 1 for the project location map, and record drawings of the original channel construction (as-builts) in the attachment section of this RFP.
Design
Water / Sewer
$8,621,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 1, 2026
1180 Main St, Redwood City, CA
Related To This Project
Redwood City, CA
Bid Date: May 23 2025
Redwood City, CA
Bid Date: May 21 2025
Redwood City, CA
--
Redwood City, CA
Bid Date: Jun 04 2025
Redwood City, CA
Bid Date: Jul 01 2025
Redwood City, CA
Bid Date: Jun 25 2025
Redwood City, CA
Bid Date: Jul 08 2025
Redwood City, CA
Bid Date: Apr 30 2018
Redwood City, CA
--
Redwood City, CA
Bid Date: May 08 2025
Redwood City, CA
Bid Date: Apr 23 2025
Redwood City, CA
Bid Date: Apr 25 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
