BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 23, 2025 at 8:00 PM

Updated June 24, 2025

Demolition, site work, renovation and addition to an educational facility in Hanover, Pennsylvania. Completed plans call for the addition of a educational facility.

The project consists of selective demo of existing building, and construction of additions and renovations. For a full scope of work please see the complete project documents. Additional Bid Info: Our bids are due to the owner on May 22nd, at 2:00PM AM. Please have your bids to us no later than May 22nd at 9am. There is a pre bid meeting at the Elementary School on April 24th, at 3:00pm. If you are biding demolition or site and need to see existing conditions this would be a good opportunity. RFIs need to be received 7 days prior to bid date if you want them to be addressed. This project will begin approximately June of 2025. Substantial completion: August 13th, 2027 Final completion: October 12, 2027 Phased Construction, bid accordingly. See phasing plan. This project is bidding as a multi-prime project. Plumbing, HVAC, and Electrical contractors are required to bid directly to the owner. Prevailing wages do apply. Please bid accordingly. The project involves 4 alternates. Please review spec section 012300 and provide all that effect your scope with your bid. There are 7 unit prices. Please review 012200 and provide all that apply with your bid. No substitutions requests will be considered during the bid period. Bids shall be based on products from one of the manufactures specified or an "equal" product. Substitution requests submitted more than 60 days after Notice to Proceed must be accompanied by a credit proposal. The project owner or eciConstruction will not pay any materials increases after a bid is submitted. Please include any required materials increases in your bid. A. The Project consists of selective demolition of portions of the existing Conewago Township Elementary School and construction of additions and renovations for the Conewago Valley School District. B. Generally, the new construction consists of load bearing masonry, structural steel framing, steel joists and metal deck, masonry veneer, exterior metal wall panels, mechanically attached EPDM membrane roofing, aluminum windows, storefront system, curtain wall system, casework, and interior finishes along with the specified mechanical, electrical and plumbing systems. Renovations consist of replacement of interior finishes including, but not limited to, ceiling tile, flooring, casework, countertops, painting, hollow metal frames and doors, exterior windows and specified mechanical, electrical, and plumbing systems. Site construction consists of new parent and bus driveways, access roads, subsequent parking, lighting, stormwater management systems, and fencing.

Award

Educational

$32,928,531.00

Public - City

Addition, Demolition, Renovation, Site Work

222

33

471

4

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
475
Active Projects
232
Bidding Soon
3,095
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2025

June 30, 2025

Project location map

1189 W Elm Ave, Hanover, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.