BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 29, 2025 at 8:00 PM

Updated August 30, 2025

Site work for a water / sewer project in Fairfield, Connecticut. Completed plans call for site work for a water / sewer project.

As of August 29, 2025, this project this project has been awarded. A firm construction timeline has not been established. The Town of Fairfield in conjunction with the Town of Fairfield WPCA has issued this one-step solicitation for its Phase 1 - WPCF Plant Equipment Improvements (Project) to invite responses from experienced and capable parties to this request for qualifications (RFQ). The purpose of this RFQ is to retain services of a qualified responder to provide progressive design - build services for the high priority capital improvement projects at the WPCF. The design-builder will be retained under the EJCDC Contract Agreement for Progressive Design-Build Services. Design-Builder shall provide a scope of work inclusive of all items described in Section 2.1 of this RFQ. The WPCF is located at 330 Richard White Way, Fairfield, Connecticut. The total average daily influent flow at the plant is 8.64 MGD. The facility operates near its permitted capacity of 9 MGD in accordance with its state issued NPDES Permit (Permit No. CT0101044). The WPCF was constructed in 1950 and expanded in 1968 and 1972. Over time new processes were added or updated including sludge dewatering equipment, a sludge composting facility, and biological process improvements for nitrogen removal. The last upgrades were completed in 2002 and consisted of aeration tanks, new settling tanks, UV disinfection system, effluent pumping, and odor control biofilters. The plant effluent water discharges to Long Island Sound. A Wastewater Facilities Plan was developed by Wright-Pierce Incorporated in 2018. In 2024, Woodard & Curran, Inc. performed an equipment condition assessment to reflect prioritization of plant infrastructure upgrades and equipment replacements to inform development of WPCA's capital budget for the Project. Phase 1 Design and Preconstruction Services (Preliminary Stage): to be completed by July 1, 2026. Phase 2 Final Design, Construction, and Commissioning Services (Completion Stage): to be completed by July 1, 2029. Award expected July 1, 2025 Addendum 1 - 23 April 2025: QA Addendum 2 - 24th April 2025: QA Shortlist Confirmed.

Award

Water / Sewer

$5,000,000.00

Public - City

Site Work

3

8

8

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
819
Active Projects
298
Bidding Soon
6,927
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2025

October 6, 2025

Project location map

330 Richard White Way, Fairfield, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.