Site work for a water / sewer project in Fairfield, Connecticut. Completed plans call for site work for a water / sewer project.
As of August 29, 2025, this project this project has been awarded. A firm construction timeline has not been established. The Town of Fairfield in conjunction with the Town of Fairfield WPCA has issued this one-step solicitation for its Phase 1 - WPCF Plant Equipment Improvements (Project) to invite responses from experienced and capable parties to this request for qualifications (RFQ). The purpose of this RFQ is to retain services of a qualified responder to provide progressive design - build services for the high priority capital improvement projects at the WPCF. The design-builder will be retained under the EJCDC Contract Agreement for Progressive Design-Build Services. Design-Builder shall provide a scope of work inclusive of all items described in Section 2.1 of this RFQ. The WPCF is located at 330 Richard White Way, Fairfield, Connecticut. The total average daily influent flow at the plant is 8.64 MGD. The facility operates near its permitted capacity of 9 MGD in accordance with its state issued NPDES Permit (Permit No. CT0101044). The WPCF was constructed in 1950 and expanded in 1968 and 1972. Over time new processes were added or updated including sludge dewatering equipment, a sludge composting facility, and biological process improvements for nitrogen removal. The last upgrades were completed in 2002 and consisted of aeration tanks, new settling tanks, UV disinfection system, effluent pumping, and odor control biofilters. The plant effluent water discharges to Long Island Sound. A Wastewater Facilities Plan was developed by Wright-Pierce Incorporated in 2018. In 2024, Woodard & Curran, Inc. performed an equipment condition assessment to reflect prioritization of plant infrastructure upgrades and equipment replacements to inform development of WPCA's capital budget for the Project. Phase 1 Design and Preconstruction Services (Preliminary Stage): to be completed by July 1, 2026. Phase 2 Final Design, Construction, and Commissioning Services (Completion Stage): to be completed by July 1, 2029. Award expected July 1, 2025 Addendum 1 - 23 April 2025: QA Addendum 2 - 24th April 2025: QA Shortlist Confirmed.
Award
Water / Sewer
$5,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 14, 2025
October 6, 2025
330 Richard White Way, Fairfield, CT
Related To This Project
Fairfield, CT
Bid Date: Jun 03 2025
Fairfield, CT
--
Fairfield, CT
Bid Date: Jun 12 2025
Fairfield, CT
--
Fairfield, CT
Bid Date: Aug 29 2025
Fairfield, CT
--
Fairfield, CT
Bid Date: May 28 2025
Fairfield, CT
Bid Date: Apr 23 2025
Fairfield, CT
--
Fairfield, CT
Bid Date: Apr 22 2025
Fairfield, CT
Bid Date: Apr 23 2025
Fairfield, CT
Bid Date: Apr 24 2025
Fairfield, CT
Bid Date: Apr 29 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.