Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 24, 2025 at 8:00 PM

Updated July 25, 2025

Site work and new construction of a municipal facility in Maryville, Missouri. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

The Nodaway County Ambulance District is acceptings ealed bids for the service of building consultant in the construction of a new ambulance station facility. The bids are to comply with the requirements of the Request for Proposals prepared by the district regard-ing building consultant services for this project. The Nodaway County Ambulance District reserves the right to reject any or all bids. Nodaway County EMS is seeking bids for a new addition and remolded existing building. The new addition should be approximately 1500 sq ft. with an unfinished basement with 9ft walls. New addition requirements. Exterior walls should be 2x6 framing and covered with prefinished engineered siding The addition will have a metal standing seam roof All interior walls will be constructed using wood framing and insulated for sound as Required. All exterior walls will have blown-in insulation All ceilings of the addition will be finished dry wall and painted All interior doors will be residential grade and match existing doors. 2 Full bathrooms 1 Laundry room and mechanical room 1 Common room with full kitchen and dining room and living space. All HVAC, electrical and complete plumbing A total of 7 bedrooms between the new addition and existing building Each bedroom with have AC/heating mini split unit. Flooring in bedrooms should be industrial carpet, and all other areas should be Vinyl laminate. Upgrades to the existing building requirements. 5 offices (use of existing office and build 4 new offices) Remodel and upgrade existing bathroom and kitchen Secure entrance from foyer to office space and living quarters New windows and siding building New vinyl laminate in new offices and bathroom and kitchen Computer server room at least 5ft x5ft in size. New addition should connect to existing building. Monitored Alarm System for fire alarms/CO alarms for new and existing buildings Prevailing wage labor rates must be included in bids.

Award

Municipal

$717,737.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
66
Bidding Soon
868
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2025

June 30, 2025

Project location map

To Be Determined, Maryville, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed