Published June 9, 2025 at 8:00 PM

Updated June 12, 2025

Renovation of an educational facility in Maryville, Missouri. Completed plans call for the renovation of a educational facility.

. Scope: The project includes the removal of the existing roof down to structural slab and installation of new EPDM roofing system at The Station. It also include the demolition of the existing roofs down to structural slab at Roof Areas A, B, C, E, F, G and H and installation of new EPDM roofing system at these Roof Areass at the Student Union. At the Station, the existing cooling towers and associated supports will be demolished. In addition, the existing roof hatch will be removed and replaced with a new roof hatch. At the Station, (4) four new drain pairings will be added with new stormwater and overflow drain system installed to run through the building and connect to the existing below grade stormwater system. At both buildings, existing equipment will be removed and reinstalled and their respective equipment curbs will be removed and replaced with raised, insulated equipment curbs. At both buildings, walking pads will be placed. At the Student Union, limited piping runs will be upsized to meet current codes. At the Student Union, new access ladders will be installed for access to the Penthouses. At the Student Union, the majority of the metal panels at the South Penthouse will be removed and replaced with new metal panels as an additive alternate. At both buildings, code minimum fall protection will be included in the project as part of the Base Bid. At both buildings, a comprehensive fall protection system will be included as an additive alternate. At both buildings, a lightning protection system will be included as an additive alternate. At the Student Union, work at Roof Areas, E, F and G will be included as an additive alternate. The scope includes all work contained within the Contract Documents. B. MBE/WBE/SDVE Goals: MBE 10%, WBE 10% & SDVE 3% Note: Only MBE/WBE firms certified by a State of Missouri public entity, and SDVE(s) meeting the requirements of Section 34.074, RSMo, and 1 CSR 30-5.010, as of the date of bid opening, can be used to satisfy the MBE/WBE/SDVE participation goals for this Project Question Deadline 06/04/2025 No bidder shall be entitled to rely on oral interpretations as to the meaning of the plans and specifications or the acceptability of alternate products, materials, form or type of construction. Every request for interpretation shall be made in writing and submitted with all supporting documents not less than five (5) working days before opening of bids.

Post-Bid

Educational

$200,000.00

Public - State/Provincial

Renovation

66

19

399

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
80
Bidding Soon
889
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2025

July 8, 2025

Project location map

800 University Dr, Maryville, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.