BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 28, 2025 at 8:00 PM

Updated July 29, 2025

Site work and paving for a transportation facility in Americus, Georgia. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

The work consists of furnishing all labor, equipment, and materials and performing all work in strict accordance with the plans and specifications for: RUNWAY AND TAXIWAY PAVEMENT REHABILITATION The location of the work is at the Jimmy Carter Regional Airport, Americus, Georgia. A Bidder's bond must be executed on the form furnished by the Owner, and the required bond, cash, cashier's check, or certified check must accompany each proposal, in the amount of 5% of the total amount of the proposal. A 100% performance bond and a 100% payment bond will be required of the Contractor at time of contract execution. A Georgia Resident Agent must countersign all bonds from a surety company authorized by law to do businessin this State pursuant to a current certificate of authority to transactsurety business by the Commissioner ofInsurance; no bond shall be approved unlessthe surety is on the United States Department of Treasury's list of approved bond sureties. All work under Bid Schedule A (Runway 5-23 Pavement Rehabilitation) shall be completed within FortyFive (45) Calendar Days from the issuance of the notice to proceed. Maximum time for Runway 5-23 closure shall be Thirty (30) Calendar Days. Liquidated damagesfor additional days of runway closure shall apply. Contract time for Bid Schedule B (Parallel Taxiway Pavement Rehabilitation) is Seventy-Five (75) Calendar Days from the issuance of the notice to proceed. The maximum construction time allowed for Schedules A and B will be the sum of the time allowed for individual schedules but not more than One Hundred Twenty (120) Calendar Days. Permitting the Contractor to continue and finish the work or any part of it after the time fixed for its completion, or after the date to which the time for completion may have been extended, will in no way operate as a wavier on the part of the Owner of any of its rights under the contract. If Additive Bid No. 1 (New Connector Taxiway) is awarded an additional Fifteen (15) Calendar Days of contract time will be added to the overall schedule. If Additive Bid No. 2 (Runway 10-28 Displaced Threshold) is awarded an additional Five (5) Calendar Days of contract time will be added to the overall schedule. Liquidated Damages: Liquidated damagesfor delaysin completion will be Five Hundred Dollars($500.00) per calendar day. Liquidated Damages for exceeding runway closure time will be Two Thousand Dollars ($2,000.00) per calendar day. Payment will be made monthly on completed work. Retainage will be held by the Owner to a maximum of ten percent (10%) of each progress payment. The Right to Reject Any or All Bids and to Waive Informalities is Reserved to the Owner. ***Bid Event: Bids must be sealed envelopes with the bidder's name, full mailing address, and General Contractor License Number shown as the return address. Sealed envelopes shall be marked as follows: "BID ENCLOSED - Runway and Taxiway Pavement Rehabilitation, Americus, Georgia. Project No. 017888002." and mailed or hand delivered prior to the bid opening date and time to: Terrell Templin, Chairman Americus-Sumter County Airport Authority Jimmy Carter Regional Airport 233 Frankie Williams Road Americus, Georgia, 31709 Please note that bids will only be considered by those bidders and subcontractors currently pre-qualified with the Georgia Department of Transportation. Bids will be required to remain open for acceptance or rejection for one-hundred and twenty (120) calendar days after the date of opening of bids. Solicitaion no: AP025-XXXX-XX(261) Sumter County

Bid Results

Transportation Terminals

$3,800,000.00

Public - City

Paving, Site Work

55

5

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
41
Bidding Soon
654
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 30, 2025

July 29, 2025

Project location map

223 Airport Rd, Americus, GA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.