BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 3, 2026 at 8:00 PM

Updated June 4, 2026

Site work for a civil project in Middleton, Idaho. Completed plans call for site work for a 2,296-square-foot water / sewer project.

The Project Includes the Following Work: Construction of a New Wastewater Treatment Plant With Decommissioning of the Existing Treatment Plant. Components of The New Wastewater Treatment Plant Include Preliminary Treatment With Screening and Grit Removal Housed Within a New Headworks Building, Primary Treatment With Activated Primary Clarifiers and Equalization Basin, Secondary Treatment With Step-feed Biological Basins, Blower Support Building, and Secondary Clarifiers, Tertiary Building Housing Ultraviolet (UV) Disinfection and Personnel Support Facilities, Dewatering Building And Sludge Storage. The Project Additionally Includes Several Supporting Pump Station Facilities and Off-site Water Main Extension. The Project Has an Expected Duration of 1,095 Calendar Days (36 Months). The Engineer's Opinion of the Probable Costs for This Construction is About 67 Million Dollars. No Federal Funds Are Associated With This Contract. Question Deadline 06/18/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Contact: Ripan Saha, Ardurra at Office: 505.257.2643 Email: rsaha@ardurra.com

GC Bidding

Water / Sewer

$67,000,000.00

Public - City

Site Work

930

44

19

2

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
31
Bidding Soon
391
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2026

August 24, 2026

Project location map

To Be Determined, Middleton, ID


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.