BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 24, 2026 at 7:00 PM

Updated January 25, 2026

Site work and new construction of a water / sewer project in Middleton, Idaho. Completed plans call for site work for a water / sewer project; and water / sewer project.

The project provides for an expansion to the existing wastewater treatment plant (WWTP), with a new treatment train process having a treatment capacity to 2.0 million gallons per day (MGD) with the ability to expand the plant to an ultimate capacity of 2.75 MGD. The expansion and increased treatment capacity will be accomplished by constructing major facilities and improvements including: a new headworks facility with bar screen, influent pumps, fine screens, grit removal, and influent metering flume; two new primary clarifiers; a new equalization basin and pump station; two new aeration basins with feed pumps, mixers, and air diffusers; new blower units and building; two new secondary clarifiers; a new activated sludge pump station; a new tertiary treatment building with pressurized UV disinfection systems, W4 recycle water pump station, offices, crew space, and garage facility (tertiary filtration equipment is not anticipated in this contract); new automatic transfer switch and engine power system; two new sludge holding tanks; a new solids dewatering building with screw presses; other yard piping and plant utility additions, improvements, upgrades, and demolition; site civil improvements, modifications, and demolition. Supporting piping, plumbing, heating, ventilating, air conditioning, fabricated metalwork, painting, electrical, instrumentation and controls, site work, and other appurtenances necessary to complete the work are also included. Pre-qualification requirements: Applications will only be accepted from applicants who currently possess a valid Idaho Public Works Contractors License. A separate Application for Prequalification, specifically for the proposed project, must be prepared and submitted. Bids will only be accepted from firms who have been prequalified for the proposed project. The Owner reserves the right to reject all submissions where Owner deems rejection to be in its best interest, or to reject any submission not in compliance with the Instructions for Prequalification. The Owner reserves the right to waive any informalities and irregularities in said submittals.

GC Bidding

Water / Sewer

$60,000,000.00

Public - City

New Construction, Site Work

25

6

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
28
Bidding Soon
297
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2026

July 7, 2026

Project location map

To be determined, Middleton, ID

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.