BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 29, 2025 at 8:00 PM

Updated May 30, 2025

This is a service / maintenance or supply contract in Pomona, California. Contact the soliciting agency for additional information.

The City of Pomona ("City") is soliciting proposals ("Proposals") from a qualified Consultant team ("Proposers") to conduct professional civil engineering, survey, construction management, inspection, and sampling services in accordance with the scope of service of specifications herein. The City is seeking a licensed and registered civil engineering consultant and a licensed professional land surveyor team to generate and produce a full site plan, grading plan, and topographic survey for an existing 4.9 MG Reservoir 5A (R-5A) site. A grading plan must be produced by the professional Consultant to identify the removal of all excavated soil and installation of engineered backfill soil. Reservoir 5A was constructed in 1928. This tank has been non-operational since 2018. Tank 5A serves the City in combination with respectively two additional 10 million gallon concrete reservoirs (R-5B and R-5C) onsite. Reservoir 3A is a concrete reservoir available to serve with these other concrete tanks to serve pressure zone 5. There is approximately 26.7 MG of combined capacity for these pressure zone 5 reservoirs. The proposed site plan must include and identify future space for a minimum 80' diameter 0.5 MG reservoir. A separate invitation for bids (IFB) will be advertised for the labor to demolish the site, backfill the reservoir structural void, and compact the backfill. The City of Pomona is planning to demolish the existing R-5A site with all structures, some associated piping, valves, and appurtenances by a licensed Class A or C-21 contractor. The City requires the contractor to follow the demolition plan to identify the proposed demolition site, a demolition debris hauling route, a grading plan, topographic survey, obtain all demolition permits, and the subsequent final site completion record plan for the infrastructure removal. All reservoir walls, roof, floor, support columns, and appurtenances must be demolished. The demolition contractor must also provide continuous air sampling to ensure that the air quality meets the South Coast Air Quality Management District's requirements. Online Q&A Yes Q&A Deadline 05/28/2025 10:00 AM (PDT) Type of Award Lump Sum Bid Valid 180 days Response Types Cost File Pre-Bid Meeting No Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
606
Active Projects
271
Bidding Soon
3,441
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.