Site work for a water / sewer project in Lacey, Washington. Completed plans call for site work for a water / sewer project.

A certified or bank cashier's check for 5 percent of the bid amount, payable to Thurston PUD, or a bid bond executed by a licensed bonding company is required with each bid. Tanglewilde 600 Mainline Replacement. The project consists ofthe replacement of approximately 11,000 linear feet of mainline including all valves, hydrants, service laterals, and meter boxes. The District is an equal opportunity employer. All work performed on the project will be subject to state prevailing wage rates. at the District's main office at 1230 Ruddell Rd SE, Lacey WA 98503. Estimated Cost of the Project: $2,945,000 o 11,000 ft mainline, plus valves, hydrants, services o Funded by Washington State Public Works Board o Cost escalation clause o Timeline: 180 days to substantial completion from NTP. Substantial completion is completion of all mainline and services replacement; however, final site restoration, or other minor workmanship as approved by the Customer shall be completed within 240 days of NTP. o Contractor supplies traffic control plan o Spill prevention plan and materials onsite o %-in double services may be installed on 1" laterals (per allowance for existing services in standard drawing 5B) o Construction limited to 7am to 7pm, M-F unless otherwise approved. o Replacement activities at or impacting the intersection of Ranger Drive SE and 5th Ave SE shall be completed prior to September 8th, 2025 (first day of School at Lydia Hawk Elementary). Replacement activities at or impacting Wildcat Street SE between Cougar Street SE and Huskey Way SE shall not begin prior to September 8th , 2025 in order to maintain access to Tanglewilde Recreation Center pool. o Service outages to be minimized; require 7 calendar day's notice, duration cannot exceed 8 hours without provision of temp service (at contractor's expense). o Coordination for work on 12'' DI main from reservoir (corner of Ranger DR SE & 5th Ave SE), advance notice for activation of City of Lacey intertie. o Existing utilities of record are shown on the Plans. These are shown for convenience only, and the Engineer assumes no responsibility for improper locations or failure to show utility locations on the Plans. o Contractor responsible for adhering to permit requirements, including requesting permit issue, inspections, and closeout of ROW permit. o No allowance made for cold patch; contractor to include cost for cold patch in other line items as deemed necessary. Thurston PUD recommends installing service laterals up to curb stops and pressure testing to curb stops when main is installed to allow for immediate roadway restoration without further roadway excavation. o Contractor to abide by contract for laydown area, including fencing, restoration, and any county requirementsThe scope of work provides for the replacement of water distribution infrastructure as identified on provided drawings. This work generally includes the following: 1. General Site: a. Erosion and sediment control. b. Tree removal c. Clearing and grubbing. 2. Water Main Replacement: a. Trenching, compacting, and backfilling. b. Installation of water mains, valves, hydrants, and appurtenances c. Replacement of services up to and including meters and boxes d. Coordination and connection to existing distribution system. e. Water main testing and disinfection. 3. Restoration a. Restoration of paved roadway and/or roadway shoulder b. Restoration of driveway crossings c. Soil preparation and planting. d. Restoration of minor private improvements 4. Other work necessary to provide a complete and functional system constructed in accordance with the Contract Documents. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$2,297,960.00

Public - County

Site Work

13

16

8

6

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
70
Bidding Soon
1,467
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2025

July 22, 2025

Project location map

To Be Determined, Lacey, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.