BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2025 at 8:00 PM

Updated August 27, 2025

Site work for a water / sewer project in Alameda, California. Completed plans call for site work for a water / sewer project.

Approximate cost of construction: $1,000,000. The Project includes, but is not limited to, performing the following Work: 1. Furnishing all labor, tools, equipment, materials, except as herein specified; and doing all work associated with the closure and abandonment of one (1) 6,000 gallon gasoline single walled UST and two (2) 1,000 gallon diesel single-walled USTs and the procurement and installation of one (1) new double-walled gas/ diesel Aboveground Fuel Storage Tank (AST). The new AST will be located inside the covered vehicle wash bay at the City of Alameda Maintenance Service Center, located at 1616 Fortmann Way, Alameda, CA 94501. Associated work includes the installation of new double-walled fuel piping, two (2) new gas and diesel dual-hose fuel dispensers, new tank level monitor, new AST-mounted fill bucket, new steel bollards, new ceiling-mounted light fixtures, and concrete pad/ site work. Other work includes the demolition and removal of existing single-walled fuel piping, vehicle wash equipment, three (3) fuel dispensers, UST fill buckets and covers, and all wall- and ceiling-mounted light fixtures inside the fuel island/ vehicle wash building. This Upon award of the contract, the successful Bidder shall furnish a bond for faithful performance in the amount of 100% of the total bid. The successful Bidder shall also furnish a bond to secure the payment of all claims for labor and material in the amount of 100% of the total bid. Further, the successful Bidder, and all subcontractors, shall pay for and obtain a City of Alameda Business License. As per PCC section 20170, all bids shall be submitted under seal and accompanied by cash, a bidder's bond executed by an admitted surety insurer, a cashier's check, or certified check payable to the City of Alameda in an amount equal to 10% of the total amount bid (PCC 20171). The City reserves the right to reject any or all bids; to waive minor defects or technicalities, or to solicit new bids.

Bid Results

Water / Sewer

$1,975,500.00

Public - City

Site Work

32

16

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
555
Active Projects
244
Bidding Soon
2,876
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2025

August 4, 2025

Project location map

Multiple Locations, Alameda, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.