Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 10, 2025 at 8:00 PM
Updated June 11, 2025
Renovation of a mixed-use development in Holt, Michigan. Completed plans call for the renovation of a educational facility.
Holt Public Schools invites qualified vendors to submit proposals for the replacement of existing drinking fountains with filtered drinking water stations in accordance with Michigan's Filter First legislation (Public Act 197 of 2023). This project covers eight (8) district buildings and aims to ensure safe, accessible, lead-reduced drinking water for all students and staff. Background Public Act 197 of 2023 mandates all Michigan schools to provide filtered water access points that meet NSF/ANSI certification standards. Holt Public Schools seeks full compliance through certified Elkay water station installations. The selected vendor will: o Conduct a district-wide walkthrough and site assessment o Remove existing units and responsibly dispose of them o Dumpster provided by contractor o Supply and install: o 57 Elkay LZS8WSSP-PF filtered drinking fountains o 50 Elkay Avado KLAV7051 filtered faucets o One Elkay Water Sentry Model 71300C replacement filter per unit o Handle all necessary plumbing and electrical work o Ensure ADA and Michigan state compliance o Provide staff training and documentation for legal compliance Provide a complete and functional product. Project Start Date: July 1, 2025 Completion Target: December 31, 2025 All Requests for Clarification must be directed to Ryan Zoumbaris, Director of Facilities, at ryan.zoumbaris@hpsk12.net with subject line: " Drinking Fountain Replacement Project - Michigan Filter First Compliance Question Deadline 05/31/2025 at 4:00 PM ET . The Board of Education or its designee reserves the right to reject any or all bids, in part or in total, for any objective or subjective reason whatsoever. Late bids will not be opened. Equipment by Location - Junior High School, Sycamore, Wilcox, Washington Woods, Holt High School - Main, Horizon, Holt High School - North, Elliott
Award
Educational
$246,008.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 6, 2025
July 1, 2025
Multiple Locations, Holt, MI
Related To This Project
Holt, MI
Bid Date: Jul 18 2025
Holt, MI
Bid Date: Nov 12 2025
Holt, MI
Bid Date: Dec 10 2025
Holt, MI
Bid Date: May 02 2025
Holt, MI
Bid Date: Feb 27 2025
Holt, MI
Bid Date: Jan 24 2025
Holt, MI
Bid Date: Apr 12 2024
Holt, MI
Bid Date: Mar 04 2024
Holt, MI
Bid Date: Mar 11 2024
Holt, MI
Bid Date: Feb 12 2024
Holt, MI
Bid Date: Feb 01 2024
Holt, MI
Bid Date: Oct 11 2023
Holt, MI
Bid Date: Jun 18 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
