BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 12, 2025 at 8:00 PM

Updated June 13, 2025

Renovation of a fire / police facility in Newport News, Virginia. Completed plans call for the renovation of a fire / police facility.

The purpose of this Request for Quotes (RFQ) is to solicit quotes to construct concrete masonry unit (CMU) block walls on several upper floors of the Newport News Fire Department's (NNFD) Fire Training Tower . Question Submission Deadline:June 6, 2025, 12:00pm Contractor shall construct CMU block walls on the second, third and fourth floors of the Fire Training tower. Requirements Contractor shall: o Construct / infill three interior walls with 8" CMU including new masonry openings. Openings in the new walls will be for interior doors and shall have a header and corner blocks shall be used at the openings. o Construct / infill three exterior walls with 8" CMU without openings. o Tie in new block walls to existing walls, ceilings and slab. o Provide precast lintels above interior doors. o Finish rough block ends at door openings with mortar. o Provide #4 rebar in horizontal bond beams at each infill. o Provide #5 vertical rebar at 24" on center at each infill. o Provide all necessary mortar and sand. o Provide all necessary corrugated ties and drive pins. o Work with NNFD Training staff to schedule work and to locate the storage of equipment, materials and vehicles once work begins. o Work with NNFD Training staff to satisfy any site needs such as water or electricity. o Clean-up trash and any remaining sand. Additional Information o The prices quoted shall include without exception all materials, supervision, labor, equipment, appliances, clean-up, incidental items, applicable sales, use and other taxes, insurance, building permit or fees, and the Contractor's labor, overhead, profit, mobilization and other mark-ups, and in full accordance with the Scope of Work. Include allowance for waste where appropriate. o All work and goods provided shall, at a minimum, meet the most current industry building codes. o The doors for the openings have already been purchased and are on site. The openings in the block walls shall be sized to fit the doors. All of the doors are the same size and will be placed on each floor for the Contractor to take dimensions from. The contractor that made the doors will return to install them once the block work is completed. o NNFD Fire Training Center (FTC) staff will remove all existing railings on the affected floors just prior to Notice to Proceed. o The City desires project completion prior to August 2025 and 30 days after the Notice to Proceed.

Bid Results

Fire / Police

$70,573.00

Public - City

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
29
Bidding Soon
1,163
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2025

July 10, 2025

Project location map

17300 Warwick Blvd, Newport News, VA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.