BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 9, 2025 at 8:00 PM

Updated July 10, 2025

Site work, paving and outdoor lighting for a mixed-use development in Prosser, Washington. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

**As of July 9, 2025, the project was awarded Accountable Construction & Environmental ServiceS, with an awarded amount of$66,124.59.** Sealed proposals will be accepted for the Red Blend Villas Sidewalk and Street Light Improvements. This contract will not include working days, however the project shall be completed on or before July 25, 2025. All questions regarding the project should be directed to Marty Groom at: (509) 786-8201 or mgroom@ci.prosser.wa.us. The City of Prosser is an Equal Opportunity and Affirmative Action Employer. The Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin. Small, Minority-and Women-owned firms are encouraged to submit bids. The City of Prosser reserves the right to reject any and all bids and to waive technicalities or irregularities, and after careful consideration of all bids and factors involved, make the award to best serve the interests of the City of Prosser. Bid date notes: All bids or proposals must be in writing on the form included in the RFP, sealed and filed with the Clerk on or before the day and hour above mentioned. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Scope Of work - The City is seeking bid proposals from qualified Contractors to excavate, prepare sidewalk subgrade, place crushed surfacing top course, construct cement concrete sidewalk, construct ADA curb ramps and install solar street lights on Vineyard Street in the Red Blend Development. The scope of work shall include the following: Excavate sidewalk and ADA curb ramp areas to 6 inches below the existing top of curb, excavation shall be disposed of by the Contractor. o Grade and compact the existing subgrade, city personnel will visually inspect the compaction. o Place and compact 2 inch depth of crushed surfacing top course on sidewalk grade and ADA curb ramp areas, city personnel will visually inspect the compaction. o Form and pour cement concrete sidewalk 4 foot wide and 4 inch depth as per attached City Standard Detail ST-5. o Form and pour cement concrete ADA curb ramps as per attached WSDOT Standard Plan F-40.16-03 Type Single Direction A and Type Parallel B. o Cement concrete for sidewalk and ADA curb ramps shall be 6 sack mix, 564 lbs of cement per cubic yard. o There are a total of six (6) each precast street light bases onsite. Four (4) street light bases are installed, however, three (3) street light bases need to be removed and relocated, the Contractor shall remove the 3 bases and relocate the bases to locations as designated by the City, approximate locations are shown on the attached map. The Contractor shall backfill and compact the void left from removal. o The precast street light base dimensions are as follows: o 4 each, 3/4 inch diameter anchor studs threaded o 8 inch square on center spacingo Install street light pole, roadway arm, solar street light lamp and verify operation. Street light assembly cut sheets are attached, no alternative options shall be allowed. Question Deadline May 30, 2025

Award

Roads / Highways

$66,125.00

Public - City

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
30
Bidding Soon
303
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2025

July 7, 2025

Project location map

To Be Determined, Prosser, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.