BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 11, 2025 at 7:00 PM

Updated December 12, 2025

Site work and paving for a road / highway in Prosser, Washington. Conceptual plans call for site work for a one-story above grade road / highway; and one-story above grade road / highway.

The City of Prosser Solicits Interest From Consulting Firms With Expertise in Civil and Structural Engineering, Design, Construction Management and Administrative Services for a 3-year Professional Services Negotiated Hourly Rate Contract. This Agreement Will Be Executed From Approximately January 27, 2026 Through January 27, 2029 With the Option for the City of Prosser to Extend the Agreement for Additional Time and Negotiated Cost as Necessary. Consultants Will Be Considered for the Following Projects: Byron Road Improvements - Sheridan Avenue to West City Limits Alexander Ct. Phase 2 Improvements - Highland Drive to Wine Country Road Project Description - Byron Road Improvements The Work to Be Performed by the Consultant Will Include, but May Not Be Limited to, Preparing Preliminary Engineering Design and Construction Management for Improvements to 1.0 Mile of Byron Road From Sheridan Avenue to the West City Limits. The Proposed Improvements Include Widening the Road by Full Depth Reclamation (Fdr) to Accommodate Two Lanes of Traffic, Improving the Shoulders, Storm Drainage, Hot Mix Asphalt, Pavement Markings and Other Related Work. All Work is Anticipated to Be Within City Right-of-way. This Project Has Been Assigned a 0% Dbe Goal by Wsdot. Project Description - Alexander Ct. Phase 2 Improvements The Work to Be Performed by the Consultant Will Include, but May Not Be Limited to, Preparing Preliminary Engineering Design and Construction Management for Improvements to .25 Miles of Alexander Ct. Phase 2 From Highland Drive to Wine Country Road. The Proposed Improvements Include Full Depth Reclamation (Fdr), Excavation, Removal of Curb, Gutter and Sidewalk, Storm Drainage, New Curb, Gutter and Sidewalk, Hot Mix Asphalt, Illumination System, Pavement Markings and Other Related Work. All Work is Anticipated to Be Within City Right-of-way. This Project Has Been Assigned a 0% Dbe Goal by Wsdot. The City of Prosser Reserves the Right to Retain the Services of the Successful Firms for Any Subsequent Phases of Preliminary Engineering and Construction Engineering Associated With These Projects. The City, in Accordance With Title Vi of the Civil Rights Act of 1964, and the Regulations, Hereby Notifies All Consultants That It Will Affirmatively Ensure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full and Fair Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, or National Origin in Consideration for an Award. The City of Prosser is an Equal Opportunity and Affirmative Action Employer. Disadvantage, Minority, and Women's Business Enterprises Are Encouraged to Respond. All Questions Regarding This Rfq Shall Be Directed to Marty Groom, Public Works Director. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$2,000,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
10
Bidding Soon
351
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2027

Project location map

To be determined, Prosser, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.