BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 8, 2025 at 8:00 PM

Updated September 9, 2025

Site work and paving for a mixed-use development in Prosser, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of September 8, 2025 , this project has not yet been awarded. The project is expected to be awarded tomorrow** separate sealed BIDS will be accepted for the MARGARET STREET IMPROVEMENTS AND 6TH STREET ADA RAMP IMPROVEMENTS including the following work: Excavation including haul, project temporary traffic control, crushed surfacing base and top course, planning bituminous pavement, HMC Cl. 3/8 inch PG 64H-28, storm drainage system, cement conc. traffic curb, gutter, sidewalk and related work. This contract will not include working days, however the project shall be completed on or before Friday, November 7, 2025. All questions regarding the project should be directed to Marty Groom: (509) 786-8201 or mgroom@ci.prosser.wa.us Each bid or proposal must be accompanied by bond or a certified check, payable to the order of the Treasurer of the City of Prosser for the sum of not less than 5% of said bid or proposal and none will be considered unless accompanied by such deposit, to be forfeited to the City of Prosser in the event the successful bidder shall fail or refuse to enter into a Contract with the City for the making and construction of the aforesaid improvement. The City of Prosser reserves the right to reject any and all bids and to waive technicalities or irregularities, and after careful consideration of all bids and factors involved, make the award to best serve the interests of the City of Prosser. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid Result : BID SCHEDULE NO. 1 - Margaret Street Improvements - Van Belle Excavating LLC - $181,486.00 BID SCHEDULE NO. 2 - 6th Street ADA Ramp Improvements - Dax Moreno Construction - $202,059.00

Bid Results

Roads / Highways

$383,545.00

Public - City

Paving, Site Work

11

3

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
2
Bidding Soon
180
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 21, 2025

September 22, 2025

Project location map

Multiple Locations, Prosser, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.