BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2025 at 8:00 PM

Updated June 28, 2025

Site work and paving for a bridge / tunnel in Linwood, Kansas. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Golden Road Bridge Replacements Please direct all questions to Bill Noll at publicworks@leavenworthcounty.gov Each bidder shall file with its bid a bid bond, a cashier check or a certified check drawn on any acceptable bank, made payable to Leavenworth County, Kansas, in the amount if not less than five percent (5%) of the total bid, which shall be retained by Leavenworth County until a Contract for the project has been executed. Bid bonds will be returned to the unsuccessful bidders, with the exception of the second qualifying bidder, at such timed as their bids are rejected. The bid deposit of the successful bidder and the second qualifying bidder will be returned when satisfactory bonds in the amount equal to 100% of the Contract amount, required insurance certificates, and other required documents shall have been furnished and the Contract Documents have been executed. A PERFORMANCE BOND and a PAYMENT BOND, each in the amount of 100 percent of the CONTRACT PRICE, with a corporate surety approved by the OWNER, will be required for the faithful performance of the contract. Substantial and Final Completion: Latest August 5, 2026. The County reserves the right to accept or reject any and all bids and to waive any technicalities or irregularities therein. Bids may be modified or withdrawn by written request of the bidder. received in the Leavenworth County Purchasing Office, prior to the time and date for bid opening; provided, however, that no bidder may withdraw its bid for a period of thirty (30) days from the date set for the opening thereof. The OWNER may waive any informalities or minor defects or reject any and all BIDS. Any BID may be withdrawn prior to the above scheduled time for opening of BIDS or authorized postponement thereof. Any BID received after the time and date specified shall not be considered. No BIDDER may withdraw a BID within 30 days after the actual date of the opening thereof should there be reasons why the contract cannot be awarded within the specified period, the time may be extended by mutual AGREEMENT between the OWNER and the BIDDER.

Bid Results

Bridges / Tunnels

$1,582,437.00

Public - County

Paving, Site Work

84

5

12

4

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
93
Bidding Soon
1,161
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2025

September 2, 2025

Project location map

Golden Rd, Linwood, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.